Haier HSM-24HEA03-R2 Скачать руководство пользователя страница 4

Open

No gas leakage?

5.

Detach the charge hose

6.

from the service port, open 2-way valve and 3-way. Turn

the valve rod anticlockwise until hitting lightly.

In case of gas leakage, tighten parts of pipe connection. If

leakage stops, then proceed 6. steps

If it does not stop gas leakage, discharge whole refrigerants from the service

port. After flaring work again and vacuumize, fill up prescribed

refrigerant from the gas cylinder.

Anti countercurrent joint

Gaugemanifold(for R410A)

2-way valve Liquid Side

3-way valve Gas Side

Vacuum pump(for R410A)

Tube(for R410A)

Close

2-way valve

3-way valve

Open 90

O

2-way valve

3-way valve

2-way valve 3-way valve

2-way valve

3-way valve

Valve rod cap

Valve rod cap

Service port cap

To prevent the gas leakage, turn the service port’s cap, the valve rod’s cap for 2-way

valve and 3-way’s a little more than the point where the torque increases suddenly.

After attaching the each caps, check the gas leakage around the caps.

7.

8.

Step 1.

Step 2.

Step 3.

Step 7.

Step 6.

Step 4.

The power source must be exclusively used for air

ƽ

conditioner. (Over I0A)

In the case of installing an air conditioner in a moist place,

ƽ

please install an ea-

For installation in other places, use a circuit breaker as far

ƽ

as possible.

Pipe cutting is carried out with a pipe cutter and burs must

ƽ

be removed.

After inserting the flare nut, flaring  work is carried out.

ƽ

If the refrigerant of the air conditioner leaks, it is necessary to discharge all the

ƽ

refrigerant. Vacuumize first, then charge the liquid refrigerant into air conditio-
ner according to the amount marked on the name plate.

Please do not let other cooling medium, except specified one (R410A), or air

ƽ

enter into the cooling circulation system. Otherwise, there will be abnormal
high pressure in the system to make it crack and lead to personal injuries.

Power Source Installation

Cutting and Flaring Work of Piping

Flare tooling die

1.Cut pipe

2.Remove burs

3.Insert the flare nut

CAUTION

Flare tool for R410A

Conventional flare tool

Clutch-type

clutch-type(Rigid-type) Wing-nut type (Imperial-type)

A

0~0.5mm

1.0~1.5mm

1.5~2.0mm

rth leakage breaker.

4.Flare pipe

Lean

Damage of flare Crack

Partial

Too outside

Correct

Incorrect

On Drainage

It becomes

high midway.

The gap with the

ground is too small

There is the bad
smell from a ditch

It waves.

The end is imm-
ersed in water.

Please install the drain hose so as to be downward slope without fail.
Please don’t do the drainage as shown below.

ƽ
ƽ

Please pour water in the drain pan of the indoor unit, and

ƽ

is carried out surely to outdoor.

In case that the attached drain hose is in a room, please

ƽ

apply heat insulation

Less than

5cm

confirm that drainage

4

Check Items for Test Run

Put check mark

in boxes

Gas leak from pipe connecting?

Heat insulation of pipe connecting?

Are the connecting wirings of indoor and outdoor firmly

Is the connecting wiring  of  indoor and outdoor firmly fixed?

Is drainage securely carried out?

Is the earth line securely connected?

Is the indoor unit securely fixed?
Is power source voltage abided by the code?

Is there any noise?

Is the lamp normally lighting?
Are cooling and heating (when in heat pump) performed normally?

Is the operation of room temperature regulator normal?

Please kindly explain to our customers how to operate
through the instruction manual.

Check for Installation and Test Run

Ƶ

inserted to the terminal block?

Ƶ

1

1+2=

kg

R410A

2

kg

2=

1=

B

C

D

F

E

kg

A

This product contains fluorinated greenhouse gases covered by 
the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R410A
GWP* value:1975
GWP=global warming potential
Please fill in with indelible ink,
• 1      the factory refrigerant charge of the product
• 2      the additional refrigerant amount charged in the field and
• 1+2  the total refrigerant charge
on the refrigerant charge label supplied with the product.
The filled out label must be adhered in the proximity of the product
charging port (e.g. onto the inside of the stop value cover).
A  contains fluorinated greenhouse gases covered by the Kyoto 
Protocol
B  factory refrigerant charge of the product: see unit name plate
C   additional refrigerant amount charged in the field
D   total refrigerant charge
E   outdoor unit
F   refrigerant cylinder and manifold for charging 

Contains fluorinated greenhouse gases
covered by the Kyoto Protocol

Refrigerant charge label

Ƶ

to it without fail.

Содержание HSM-24HEA03-R2

Страница 1: ...fail The power source is the same as the corresponding name plate Install an exclusive branch circuit of the power A receptacle shall be set up in a distance where the power cable can be reached Do not extend the cable by cutting it Power Source Preparation Please be subject to the actual product purchased the above picture is just for your reference Read this manual before installation Explain su...

Страница 2: ... out on the front side then connect them 3 Coat the flaring seal face with refrigerant oil and connect pipes Cover the connection part with heat insulation materials closely and make sure fixing with adhesive tape Fixing the indoor unit body Hang surely the unit body onto the upper notches of the ƽ mounting plate Move the body from side to side to verify its secure fixing In order to fix the body onto...

Страница 3: ...t perform air purging from the refrigerant pipes and indoor unit using a vacuum pump then charge additional refrigerant Outdoor unit Indoor unit A B Outdoor unit Indoor unit A B A B Outdoor unit Indoor unit Oil trap Use the same method on indoor unit Loosen the screws on ƽ terminal block and insert the plugs fully into terminal block then tighten the screws Insert the cable according to terminal n...

Страница 4: ... 1 5mm 1 5 2 0mm rth leakage breaker 4 Flare pipe Lean Damage of flare Crack Partial Too outside Correct Incorrect On Drainage It becomes high midway The gap with the ground is too small There is the bad smell from a ditch It waves The end is imm ersed in water Please install the drain hose so as to be downward slope without fail Please don t do the drainage as shown below ƽ ƽ Please pour water in ...

Страница 5: ...ar directa y suficientemente ventilado Elija un lugar que permita soportar el peso de la unidad y que no amplifique el ruido y las vibraciones Seleccione un lugar en el que los residuos y el viento generado por la unidad no cause una molestia a los vecinos Coloque la unidad en un lugar en el que pueda disponerse de la distancia de separación marcada X en la figura anterior Diagrama para la instala...

Страница 6: ...r deben conectarse a la entubación del refrigerante utilizando cinta protectora Entubación en otra dirección Corte con una cuchilla la cubierta de entubación de acuerdo con la dirección de entubación y doble los tubos de acuerdo con la posición del orificio en la pares Tenga cuidado de no romper los tubos al doblarlos Conecte previamente el cable eléctrico de interior exterior y tire de la conexió...

Страница 7: ...do con la unidad interior Afloje los tornillos del bloque de terminales e inserte los tapones completamente en los mismos Apriete entonces los tornillos Inserte el cable de acuerdo con el número del terminal de la misma forma que hizo con la unidad interior Si el cableado no es correcto no podrá alcanzarse la orientación correcta y el controlador podría resultar dañado Fije el cable con una pinza ...

Страница 8: ...ro regulados por el Protocolo de Kyoto No los libere libremente a la atmósfera Tipo de refrigerante R410A Valor GWP 1975 GWP Potencial de contribución al calentamiento global Escriba con tinta indeleble 1 la carga de refrigerante que contiene el producto de fábrica 2 la cantidad de refrigerante adicional cargada durante la instalación y 1 2 la carga total de refrigerante en la etiqueta de carga de...

Страница 9: ... luce diretta del sole e che sia sufficientemente ventilato Luogo in grado di sostenere il peso dell unità dove le vibrazioni ed il rumore non siano aumentati Luogo dove l aria di scarico ed il rumore non provocano disturbo ai vicini di casa Luogo dove sia disponibile una distanza contrassegnata da nella figura precedente Schema per l installazione dell unità interna ed esterna I modelli adottano ...

Страница 10: ...o essere uniti alla tubatura refrigerante usando nastro protettivo Tubature con altre direzioni Tagliare con le tenaglie il coperchio per la tubazione in base alla direzione della stessa e piegarla in base alla posizione del foro sulla parete Quando si piega prestare attenzione e non spaccare i tubi Connettere prima il cavo elettrico interno esterno quindi estrarre la parte connessa all isolante t...

Страница 11: ...ura Nota Solo per unità con pompa di calore fissarlo come in figura Nota Solo per unità con pompa di calore 1 Staccare il coperchio della porta di servizio della valvola a 3 vie il coperchio della valvola a stelo della valvola a 2 vie e della valvola a stelo della valvola a 3 vie collegare la porta di servizio nella protuberanza del tubo di carico basso del gruppo monometrico Poi collegare la prot...

Страница 12: ...ttaccata accanto alla porta di caricamento del prodotto es all interno del coperchio con il valore di arresto A questo prodotto contiene gas serra fluorinato trattato nel Protocollo di Kyoto B carico di refrigerante del prodotto inserito in fabbrica vedere la piastra con il nome dell unità C quantitativo aggiuntivo di refrigerante caricato sul campo D carico di refrigerante totale E unità da ester...

Страница 13: ...soit pas exposé à la pluie ou à la lumière du jour et qui soit suffisamment ventilé Sélectionnez un emplacement capable de supporter l unité où les vibrations et le bruit n augmentent pas Sélectionnez un emplacement où le vent et le bruit ne risquent pas de gêner les voisins Choisir un endroit dans lequel les distances marquées illustrées dans le schéma ci dessus sont disponibles Schéma de l insta...

Страница 14: ...des matériaux d isolation thermique et fixez avec du ruban adhésif Le câble des unités intérieures extérieures et le tuyau de vidange doivent être fixé au tuyau de réfrigérant avec un ruban protecteur Tuyauterie dans une autre direction A l aide d une pince découpez le couvercle pour la tuyauterie en fonction de la direction de la tuyauterie et cintrez ensuite le tuyau selon la position du trou da...

Страница 15: ...sérez totalement les fiches dans le bornier puis resserrez les vis Insérez le câble selon le numéro de la borne tel que pour l unité intérieure Si le câblage est incorrect le fonctionnement sera incorrect et le contrôleur risque de subir des dommages Fixez le câble avec un serre câble Fixation d un drain coudé Si vous utilisez un drain coudé procédez à la fixation selon l illustration Remarque uni...

Страница 16: ...de réfrigérant R410A Valeur de GWP 1975 GWP global warming potential potentiel de réchauffement de la planète Merci de remplir à l encre indélébile 1 la charge de réfrigérant standard de l appareil 2 la quantité supplémentaire de réfrigérant chargée sur place et 1 2 la charge totale de réfrigérant sur l étiquette de charge de réfrigérant fournie avec l appareil L étiquette renseignée doit être col...

Отзывы: