16
1.Selection of Installation Place
(1) Place above the ceiling where have enough space to arrange the unit.
(2) Place where the drainage pipe can be arranged well.
(3) Place where inlet and outlet air of indoor and outdoor unit will not be blocked.
(4) Do not expose the unit to the place with heavy oil or moisture (e.g.kitchen and workshop).
(5) Do not set the unit in the place where destructive gas (such as sulfuric acid gas) or pungent
gas (thinner and gasoline) concentrates and retains.
(6) Place strong enough to support the unit weight.
(7) No expensive articles such as television and piano below indoor unit.
(8) Enough space for maintenance.
(9) Place more than 1m away from television and radio to avoid disturbing television and radio.
(10) Easy for maintenance.
1.5m
2.5m Over
1.5m
0.31m
H
Air outlet
Air outlet
Air inlet
2.Installation Preparation
(1) Position of ceiling opening between unit and suspending bolt (front view of unit).
(2) Prepare all piping (refrigerant,water drainage )and wires (connection wire of remote controller,
indoor unit connection wires) to the indoor unit before installation in order to connect indoor unit
immediately after installation.
Ornament panel 630mm
ceiling opening 600mm
Indoor unit 570mm
Distance between
Indoor unit 570mm
Ceiling opening 600mm
Ornament panel 630mm
suspending bolts 460mm
210mm
335mm
35mm
Overlap between ceiling and
ornament panel shall be 15mm
Suspending bolts
Ceiling
Ornament panel
Installation Procedudres