Haier 2U50S2SM1FA-3 Скачать руководство пользователя страница 7

Electrical Safety Requirements

Note:
1.

The  surrounding  conditions  (ambient  temperature,  direct  sunlight  and  rainwater)  shall  be  noticed  during

electrical wiring, with effective protective measures being taken.
2.

Copper wire cable in line with local standards shall be used as the power line and connector wire.

3.

Both the indoor unit and outdoor unit shall be reliably earthed.

4.

Wiring  for  the  outdoor  unit  shall  be  made  first  and  then  the  indoor  unit.  The  air  conditioner  can  only  be

powered on after wiring and pipe connection.
5.

The dedicated branch circuit must be used, and leakage protector with sufficient capacity must be installed.

Qualification Requirements of Installer

Relevant qualification certificate must be obtained as per national laws and regulations.

Indoor Unit Installation

1.

Fixation of wall panel and piping layout

In case of left/right water pipe connection for the indoor unit, or in case the evaporator interface of the indoor

unit  and  the  horn  mouth  of  the  connecting  piping  cannot  be  extended  to  the  outdoor  side  for  installation,  the 
connector  pipes  shall  be  connected  to  the  evaporator  piping  interface  of  the  indoor  unit  in  the  process  of  horn 
mouth.  

2.

Piping layout

During layout of connecting pipes, drain hose and connector wires, the drain hose and connecting wire shall

be placed at the bottom and top respectively. The power line cannot be twined with the connector wire. The drain 
pipes (especially inside the room and machine) must be winded with thermal insulation materials.  

3.

Nitrogen charging for pressure maintaining and leak detection

After the evaporator of the indoor unit is connected to the connector pipe (after welding), nitrogen more than

4.0MPa shall be charged  inside  the  evaporator and  the  piping  connected  to evaporator  with a nitrogen  cylinder 
(adjusted by a reducing valve). Afterwards, the valve of the nitrogen cylinder shall be closed, for  leak detection
with soapy water or leak detecting solution. The pressure shall be maintained for more than 5 minutes, and then 
whether the system pressure is reduced or not shall be observed. In case the pressure is reduced, leakage can be 
identified. After the leak point is handled, the steps above shall be repeated.  

After  the  evaporator  of  the  indoor  unit  is  connected  to  connecting  piping,  nitrogen  shall  be  charged  for 

pressure maintaining and leak detection. Afterwards, the evaporator shall be connected to the two-way stop valve 
and three-way stop valve of the outdoor unit. After the copper cap of the connecting piping is fastened, nitrogen 
more than 4.0MPa shall be charged at the access hole of the three-way stop valve with a charging hose. The valve 
of  the  nitrogen  cylinder  shall  be  closed,  for  leak  detection  with  soapy  water  or  leak  detecting  solution.  The 
pressure shall be maintained for more than 5 minutes, and then whether the system pressure is reduced or not shall 
be observed. In case the pressure is reduced, leakage can be identified. After the leak point is handled, the steps 
above shall be repeated.  

The operation above can also be completed after the indoor unit is connected to the connecting pipelines and 

the two-way stop valve and three-way stop valve of the outdoor unit, after the access hole of the outdoor unit is 
connected to the nitrogen cylinder and pressure gauge and after more than 4.0MPa nitrogen is charged. No leak 
points  are  identified  in  the  leak  detection  at  the  joint/welding  junction  of  the  indoor  unit  and  at  the  joint  of 
connecting  pipelines  of  the  two-way  stop  valve  and  three-way  stop  valve  of  the  outdoor  unit.  It  must  be 
guaranteed that each joint is available for leak detection during installation.  

The next step (vacuumizing with a vacuum pump) can only be continued after the installation steps (nitrogen 

charging for pressure maintaining and leak detection normal) are completed. 

Outdoor Unit Installation

1.

Fixation and connection

Note:
a)

Fire source shall be avoided within 3m around the place of installation.

b)

The leak detection equipment of refrigerant shall be placed at a low position in the

outdoor, and shall be opened.

Содержание 2U50S2SM1FA-3

Страница 1: ...this manual carefully before installation This appliance is filled with R32 Keep this operation manual for future reference Manufactured Qingdao Haier Air Conditoner General Co Ltd Nederlands 2U40MEF...

Страница 2: ...ts 3 Installation Instructions 3 Relocation Procedures 7 Maintenance Instructions 7 Scrapping and Recovery 10 Indoor Outdoor Unit Installation Drawings 12 Safety Precautions 13 Read Before Installatio...

Страница 3: ...asily nd it Install the air conditioner in accordance with the instructions in this installation manual Be sure to use only the specified accessories and parts for installation work Install the air co...

Страница 4: ...Substances in Electrical and Electronic Equipment EU RoHS Directive WEEE In accordance with the directive 2012 19 EU of the European parliament herewith we inform the consumer about the dis posal requ...

Страница 5: ...ading 7 Smoking and open fire are not allowed around the air conditioner Transporting Management Requirements 1 The maximum transporting volume of finished products shall be determined as per local re...

Страница 6: ...re source and oil heater shall be avoided below the indoor unit 4 The power supply shall be provided with earthing wire and be reliably earthed 5 While punching the wall with an electric drill whether...

Страница 7: ...cting solution The pressure shall be maintained for more than 5 minutes and then whether the system pressure is reduced or not shall be observed In case the pressure is reduced leakage can be identifi...

Страница 8: ...stallation is firm or not The unit may fall vibrate or make a noise Whether the inspection on air leakage is completed The refrigerating capacity heating capacity may be insufficient Whether the unit...

Страница 9: ...container internal refrigeration pipelines and refrigeration elements the maintenance at the user s site is allowed including the cleaning and dredging of the refrigeration system requiring no disasse...

Страница 10: ...Nitrogen cylinders acetylene cylinders and oxygen cylinders shall be placed separately The distance between the gas cylinders above and the working area involved in open fire shall be at least 6m The...

Страница 11: ...the refrigeration system shall be earthed The refrigerant charged shall be of the type and volume specified on the nameplate Excessive charging is not allowed After maintenance of the refrigeration s...

Страница 12: ...s During the use of refrigerant charging tools cross contamination of different refrigerants shall be avoided The total length including the refrigerant pipelines shall be shortened as much as possibl...

Страница 13: ...be vacuumized before usage and be kept under normal temperature if possible The recovery equipment shall always be under favorable working state and be equipped with operation instructions to facilita...

Страница 14: ...ctric cable for indoor and outdoor Drain hose Heating insulating material Piping hole cover Fixing of outdoor unit Fix the unit to concrete or block with bolts 10mm and nuts rmly and horizontally When...

Страница 15: ...WARNING CAUTION N Open the window and well ventilated the room explosion proof fuse 13...

Страница 16: ...32 3 fire or explosion will be caused fire or explosion fire or explosion fire or explosion fire or explosion fire explosion 14...

Страница 17: ...R32 2 3 R 2 3 R R32 R32 R32 R32 R32...

Страница 18: ...c shock fire or explosion Install a explosion proof breaker for current leakage at the power source to avoid the risk of the electric shock Do not use large capacity fuses steel wire or copper wire Da...

Страница 19: ...R32 R32 R32 R32 R32 R32 R32 R32 R32...

Страница 20: ...3 R32 R32 R32 R32 R32 R32 R32...

Страница 21: ...R32 R32 R32 R32 R32 R32 R32 R32 10A HFC 410A...

Страница 22: ...NO Wind direction Air outlet 4 Installation dimension Unit mm W 1 D W2 H Cushion rubber 20 The values of The installation dimension are shown in table 3...

Страница 23: ...shall not enter the pipe CAUTION The standard pipe length is Cm If it is over Dm the function of the unit will be affected If the pipe has to be lengthened the refrigerant should be charged according...

Страница 24: ...R32 R32...

Страница 25: ...e5 ceramic type of T 25A 250V The explosion proof breaker of the air conditioner should be all pole switch The distance between its two contacts should not be no A explosion proof breaker must be inst...

Страница 26: ...erature sensor failure When the The wiring of compressor is wrong or the connection is poor Address No 1 Haier Road Hi tech Zone Qingdao 266101 P R China Contacts TEL 86 532 8893 7937 Website www haie...

Страница 27: ...3 Processo tecnologico del spostamento della macchina 7 Istruzioni di manutenzioni 7 Rottami e ricuperi 10 ATTENZIONE 1 Precauzioni di sicurezza 13 Leggere prima dell installazione 17 Processo di ins...

Страница 28: ...del condizionatore assicurarsi di spurgare il circuito refrigerante per accertarsi che sia libero dall aria e utilizzare solo il refrigerante specificato R32 Assicurarsi che il collegamento al suolo...

Страница 29: ...2014 gas fluorurati F GAS direttiva 2009 125 CE progettazione ecocompatibile dei prodott 1 il carico di refrigerante del prodotto inserito i fabbrica 2 il quantitativo di refrigerante aggiunto su post...

Страница 30: ...di estintori adatti nella carrozza di guida 8 Il lato laterale e la parte della coda dei veicoli del trasporto si devono incollare strisce di riflesso con il colore arancio e bianco o con i colori ros...

Страница 31: ...ra 4 L alimentazione deve esser messa a terra e collegare bene 5 Quando usare il trapano elettrico per forare sulla parete prima bisognare garantire se il posto libero lasciato dagli utenti ha i colle...

Страница 32: ...bi del collegamento successivamente chiudere la valvola del cilindro d azoto Controllare la perdita con l acqua e la schiuma di sapone o la soluzione di rilevazione della perdita mantenere la pression...

Страница 33: ...di raffreddamento di riscaldamento Il gruppo delle macchine isola bene a caldo Formare possibilmente la condensa e acqua goccia Lo scarico d acqua funziona bene Formare possibilmente la condensa e acq...

Страница 34: ...contenitore delle miscele refrigeranti i tubi interni di refrigerazione i pezzi di refrigerazione inclusi la pulizia del sistema di raffreddamento la pulizia dei polvere queste operazioni che non bis...

Страница 35: ...dispositivo della protezione la prevenzione d esplosione Il cilidnro d azoto il cilindro d acetilene e il cilindro d ossigeno devono esser messi separatamente I corpi gassosi devono allontanare dalla...

Страница 36: ...almente e fissato Assicurare che il sistema di raffreddamento messa a terra prima del riempimento delle miscele refrigeranti Quando fare il riempimento bisogna riempire i tipi e le quantit delle misce...

Страница 37: ...e attorno al posto della ventilazione Processo del riempimento delle miscele refrigeranti Inserire i seguenti requisiti come le aggiunte del processo normale Garantire che riempie gli strumenti con le...

Страница 38: ...lla capacit di riempimento delle miscele refrigeranti di tutto il sistema Tutti i cilindri della conserva non utilizzati sono usati specialmente per i rottami delle miscele refrigeranti e fare i segni...

Страница 39: ...esterna Fissare l unit alla pavimentazione o al blocco di cemento stringen do bene dadi e bulloni 10mm e accertarsi che l unit sia a livello orizzontale Quando si installa l unit su pareti tetti o tet...

Страница 40: ...lto peri colosa poich potrebbe ferire le persone In caso di necessit di manutenzione e riparazioni contattare il fornitore ch se ne occupi Una manutenzione e una riparazione scorrette potrebbero causa...

Страница 41: ...ivenditore o da uno specialista potrebbero causare incendi ed esplosioni tutte le operazioni necessarie per proteggersi dall ipossia che po trebbe essere causata dalla perdita di refrigerante che ragg...

Страница 42: ...re uno strato protettivo su tutti i punti dell olio della macchina refrigerante Utilizzare liquido refrigerante per caricare il sistema composizione del refrigerante ne cilindro causando un abbassa me...

Страница 43: ...amento l unit come le tubature e il compressore potrebbero divenire molto fredde o calde e causare congelamento o ustioni Non utilizzare l unit se i pannelli o le griglie di sicurezza non siano in pos...

Страница 44: ...di svasamento di tipo due 2 Strumenti e i materiali che possono essere utilizzati con l R410 con alcune restrizioni e t o N o z z i l i t U i l a i r e t a m i t n e m u r t S Rilevatore di perdite d...

Страница 45: ...i standard locali Svasatura tipo O e topo OL Le dimensioni della svasatura per le unit che utilizzano l R32 sono maggiori di quelle delle unit che utilizzano l R22 per migliorare la tenuta Dimensione...

Страница 46: ...manometro generale poich non pu misurare un vuoto di 650 Pa 4 Tempo di svuotamento Svuotare l apparecchiatura per 1 ora dopo aver raggiunto i 650 Pa Dopo lo svuotamento tenere ferma l apparecchiatura...

Страница 47: ...Installazione dell unit esterna Lasciare abbastanza spazio sul cemento delle fondamenta per i dadi di ancoraggio Una posizione in cui il cemento delle fondamenta sia abbastanza profondo Installare l u...

Страница 48: ...ssario caricare pi refrigerante in base a 20 g m Prima di aggiungere altro dell aria dalle tubature del refrigerante e dall unit interna usando una pompa a vuoto poi caricare il refrigerante B A1 B1 A...

Страница 49: ...ne del tubo Manometro di pressione di linea Brasatura delle tubature Giunto a gomito Grande connettore di inserimento Cilindro di azoto Manometro di pressione del cilindro lato del gas lato del gas Pa...

Страница 50: ...a l o v l a v a l e r i r p A tiorario Dopo 6 secondi chiudere la valvola a 2 vie ed eseguire un ispezione per accertarsi che non ci siano perdite di gas 5 Non ci sono perdite di gas Se ci sono perdi...

Страница 51: ...Il metodo di cablaggio deve essere conforme alle normative di cablaggio locali Il cavo di alimentazione e i cavi di connessione devono essere forniti Tutti i cavi devono avere la marcatura CE Durante...

Страница 52: ...nsore dell ambiente esterno Corto circuito o circuito aperto del sensore ambiente esterno 13 Anomalie nel sensore del compressore di scarico Corto circuito o circuito aperto del sensore di scarico 15...

Отзывы: