Maintenance Items 

Maintenance Requirements 

Before the refrigeration system is operated, the circulating system shall be cleaned with nitrogen. Afterwards,

the outdoor unit shall be vacuumized, the duration of which cannot be less than 30 minutes. Finally, 1.5~2.0MPa
OFN  shall  be  used  for  nitrogen  flushing  (30  seconds~1  minute),  to  confirm  the  position  requiring  treatment.
Maintenance of the refrigeration system is only allowed after the residual gas of flammable refrigerant is removed.

During the use of refrigerant charging tools, cross contamination of different refrigerants shall be avoided.

The total length (including the refrigerant pipelines) shall be shortened as much as possible, to reduce the residual
of refrigerant inside.

The cylinders of refrigerant shall be kept upright, and be fixed.

Before refrigerant charging, the refrigeration system shall be earthed.

The refrigerant charged shall be of the type and volume specified on the nameplate. Excessive charging is

not allowed.

After maintenance of the refrigeration system, the system shall be sealed with a safe manner.

The maintenance in progress shall not damage or lower the original class of safety protection of the system.

Maintenance of Electrical Components 

Partial of the electrical component under maintenance shall be subject  to inspection on refrigerant leakage

with dedicated leak detection equipment.

After the maintenance, the components with safety protection functions cannot be disassembled or removed.

During  the  maintenance  of  sealing  elements,  before  opening  the  seal  cover,  the  air  conditioner  shall  be

powered  off  first.  When  power  supply  is  required,  continuous  leak  detection  shall  be  carried  out  at  the  most
dangerous position, to avoid potential risks.

During  maintenance  of  electrical  components,  the  replacement  of  enclosures  shall  not  affect  the  level  of

protection.

After  maintenance,  it  shall  be  guaranteed  that  the  sealing  functions  will  not  be  damaged  or  the  sealing

materials  will  not  lose  the  function  of  preventing  the  entry  of  flammable  gas  due  to  aging.  The  substitute
components shall meet the recommended requirements of the air conditioner manufacturer.

Leak Detection Methods 

The  environment  in  which  the  refrigerant  leakage  is  checked  shall  be  free  from  potential  ignition  source.

Leak detection with halogen probes (or any other detector with open fire) shall be avoided.

For  the  system  containing  flammable  refrigerant,  leak  detection  may  be  realized  with  electronic  leak

detection equipment. During leak detection, the environment in which the leak detection equipment is calibrated
shall be free from refrigerant. It shall be guaranteed that the leak detection equipment will not become potential
ignition  source,  and  is  applicable  to  the  refrigerant  to  be  detected.  Leak  detection  equipment  shall  be  set  at  a
percentage of the LFL of the refrigerant and shall be calibrated to the refrigerant employed, and the appropriate
percentage of gas (25 % maximum) is confirmed.

The  fluid  used  for  leak  detection  shall  be  applicable  to  most  of  the  refrigerant.  The  use  of  chlorine-

containing solvent shall be avoided, to avoid chemical reaction between chlorine and refrigerant and corrosion to
copper pipelines.

In case leakage is suspected, the open fire at the site shall be evacuated or be put out.

In case welding is required at the leakage position, all the refrigerants shall be recovered, or be isolated at a

position far from the leak point with a stop valve. Before and during welding, the whole system shall be purified
with OFN.

SufficThe  ventilator and other electrical  equipment  at  the  maintenance  site  shall  be relatively fixed,

with

 

standardized pipe routing. Temporary wires and sockets at the maintenance site are not allowed.

Maintenance Instructions

Maintenance of Intrinsically Safe Elements 

The intrinsically safe element refers to the components working continuously inside flammable gas without any 
risks.

10

Содержание 1U22KAEFRA

Страница 1: ...24WADFRA 1U71WADFRA Please read this manual carefully before installation This appliance is filled with R32 Keep this operation manual for future reference 0011518288 1U09MAEFRA 1U12MAEFRA 1U18WAEFRA...

Страница 2: ...nts 2 Installation Instructions 3 Relocation Procedures 8 Maintenance Instructions 9 Scrapping and Recovery 13 Indoor Outdoor Unit Installion Drawings 12 Safety Precautions 14 Read Before Installation...

Страница 3: ...conditioner be sure to bleed the refrigerant circuit to ensure it is free of air and use only the specified refrigerant R32 Make sure ground connection is correct and reliable Do not earth the unit to...

Страница 4: ...and open fire are not allowed around the air conditioner Transporting Management Requirements 1 The maximum transporting volume of finished products shall be determined as per local regulations 2 The...

Страница 5: ...Air Conditioner Adding Extra Gas With Longer Pipe Calculator WARNING The area of the room in which R32 refrigerant air conditioner is installed cannot be less than the minimum area specified in the t...

Страница 6: ...e checked first after unpacking In case the sign is raised the nitrogen sealed still exists Afterwards the black plastic seal cap at the joint of evaporator liquid pipes of the indoor unit shall be pr...

Страница 7: ...Read operator manual Read technical manual Operator manual operating instructions Cotton clothes Anti static gloves BEWARE ELECTROSTATICS Goggles Electrical Safety Requirements Note 1 The surrounding...

Страница 8: ...eak detection at the joint welding junction of the indoor unit and at the joint of connecting pipelines of the two way stop valve and three way stop valve of the outdoor unit It must be guaranteed tha...

Страница 9: ...mount charged are recorded The refrigerant amount charged cannot be confirmed Test Run Installation Instructions 7 Please consult your reseller and or installer to determine if you have a DRED applian...

Страница 10: ...r re flaring the same to the outdoor unit Relocation Procedures 8 contractor supplied line a b c d a Fix the OREO module on the board through the bayonet b Reinforce OREO module with screw c Connect c...

Страница 11: ...re qualified for safety disposal of refrigerant as required in the assessment regulations 2 The equipment can only be maintained and repaired as per the method recommended by the manufacturer In case...

Страница 12: ...maintenance it shall be guaranteed that the sealing functions will not be damaged or the sealing materials will not lose the function of preventing the entry of flammable gas due to aging The substit...

Страница 13: ...ntamination of different refrigerants shall be avoided The total length including the refrigerant pipelines shall be shortened as much as possible to reduce the residual of refrigerant inside The cyli...

Страница 14: ...shall be used as the hose and shall always be under favorable state Whether the recovery equipment is under favorable state and is properly maintained and whether all the electrical components are se...

Страница 15: ...ndoor unit AIR OUTLET AIR INLET CONNECTING PIPING AND ELECTRICAL WIRING DRAIN HOSE 4 Compressor Inside of Unit 1 When installing the unit to wall roof or rooftop fix a supporter surely with nails or w...

Страница 16: ...explosion will be caused fire or explosion fire or explosion fire or explosion fire or explosion fire explosion 14 Safety Precautions R32 R R3 32 2 R32 R32 R32 R32 for conventional HFC refrigerants w...

Страница 17: ...R32 15 Safety Precautions WARNING CAUTION N Open the window and well ventilated the room...

Страница 18: ...roof breaker for current leakage at the power source to avoid the risk of the electric shock Without a breaker for current leakage will cause risks of electric shock fire or explosion Do not use large...

Страница 19: ...R32 R32 R32 R32 R32 R32 R32 R32 R32 Read Before Installation 17...

Страница 20: ...3 R32 R32 R32 R32 R32 R32 R32 Read Before Installation 18...

Страница 21: ...R32 R32 R32 R32 R32 R32 R32 R32 10A HFC 410A Read Before Installation 19...

Страница 22: ...EFRA 1U18WAEFRA 1U50WAEFRA 1U24WAEFRA 1U71WAEFRA B 60mm B 60mm A 212mm C 126mm 51mm 51mm B 60mm B 60mm AS60QEEHRA A 218mm C 151mm 38 5mm 38 5mm AS50QDEHRA Installation Procedure 655 155 130 404 Floor...

Страница 23: ...If the pipe has to be lengthened the refrigerant should be charged according to Dg m But the charge of refrigerant must be conducted by professional air conditioner engineer Before adding additional...

Страница 24: ...Installation Procedure 22...

Страница 25: ...evacuation degree Evacuate Installation Procedure 23...

Страница 26: ...cal 4G1 0mm 4G1 0mm 3G1 5mm 3G2 5mm 1U71WADFRA Power cable 3G1 5mm2 4G1 0mm 2 POWER 1U26MADFRA 1U35MADFRA 1U53WADFRA 1U71WADFRA 4G1 0mm 7 1KW 4G1 0mm 3G2 5mm 30 2 5 25 25 20 1 POWER 1U25MAEFRA 1U35MAE...

Страница 27: ...stantaneous stop F27 Directly display 8 Compressor discarging temperature protection F4 Directly display F8 Trouble record 9 Abnormal of DC motor F21 Directly display 10 Abnormal of piping sensor F7 D...

Страница 28: ...our policy of continuous product improvement these dimensionsandspeci cationsmaychangeatanytime Youshouldthereforecheckwithyourdealeror Haier s Customer Care Centre to ensure this yer correctly descri...

Отзывы: