background image

   

 

 

 

 

 

  

 

 
 

 

 
 

   

  

           

 

 
 

   

           

 

 
 

   

           

 

 
 

   

           

    

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

S

 

tep 2

 
 

 
 

 
 

Crossbar Installation

   

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

Step 1

   

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

    

S

 

tep 3

Drill 6 mm holes into the top of the 
post, from both sides.

Countersink the screw head in order for 
the screws to be flush with the posts. 

Place the crossbar in the V-shaped 
cutout on top of the posts and hold it 
in position. Drill a 3.5 mm hole into 
the crossbar by drilling through the 
previously drilled 6 mm post drilling 
line. Avoid drilling through the bar 
fully, then place the screws in the 
holes. 

Use the 6 x 100 mm screws to affix the crossbar onto the posts (2 per post). 
Screw holes should be predrilled in both posts and crossbars in order to prevent material flake.

hanit -profiles are made out of 100% recycled plastics. Slight differences in relation to colour, texture, temperature and 
dimensional variations are possible /- 3%.

To avoid material deformation, do not store in the sun or on uneven ground.

These assembly instructions have been prepared with care. However, due to specific local circumstances they may not be 
applicable or other installation methods may be more suitable.

Our product liability is limited exclusively to the properties of the hanit  components and not their use.

®

®

    

 

 

 
 

 
 

General Information

HAHN

 

HAHN Kunststoffe GmbH - Gebäude 1027 - DE 55483 Hahn-Flughafen
Phone: 

+49 65 43 / 98 86 - 0

Mail:

[email protected]

Fax: 

+49 65 43 / 98 86 - 99

Online: www.hahnkunststoffe.de

Installation Guide

 Ultra Knee Rail Fencing -

®

hanit

Отзывы: