Wall fixation
114
Technical changes reserved
Another new feature in New VegaD flush enclosures is the possibility to cut out the plastic top/bottom
part for inserting back panel in a hollow-wall with cable arrivals both sides top/bottom. It is only
possible with added opening in back panel. For this, a line has been designed on plastic part (black line
on the picture), so that the customer can follow it with its cutter and needs only to cut-out plastic.
As for Surface enclosures, a mounting hole has been created in top/bottom plastic part from back panel
for inserting a special water level. This level can be removed with a flat screwdriver. Water levels can be
ordered by Market Area at a supplier from Blieskastel.
Содержание New VegaD
Страница 1: ...Technical Manual New VegaD for surface mounting flush mounting Accessories...
Страница 8: ...About the New VegaD enclosure 8 Technical changes reserved FDX2GN empty FDX2ZN tarif bleu triphas...
Страница 37: ...Accessories Technical changes reserved 37 MCCB fixing on metal plate with M4 screws delivered by...
Страница 42: ...Accessories 42 Technical changes reserved...
Страница 47: ...Accessories Technical changes reserved 47 See mounting instruction below...
Страница 48: ...Accessories 48 Technical changes reserved...
Страница 52: ...Accessories 52 Technical changes reserved...
Страница 75: ...Accessories Technical changes reserved 75...
Страница 116: ...Wall fixation 116 Technical changes reserved Example of flush low depth enclosure protection against plastering...
Страница 121: ...Technical changes reserved 121 9 3 2 VDE CB certification for Standard IEC 61439 1 3 Technical datas certifications...
Страница 122: ...122 Technical changes reserved 9 3 3 LCIE certification for NF Standard EN 61439 1 3 Technical datas certifications...