background image

6H5570-50B

2. Power terminal connections

Use terminal lugs, rigid or flexible busbars.

Orientation

Recommended

OK

OK

NO

1. Installation

Ensure that the product is installed

on a flat rigid surface.

4.

3.

6LE007790Aa

 

HIC4xxE

Preliminary operations

Check the following upon delivery and after removal 

of the packaging:
•  Packaging and contents are in good condition.
• The product reference corresponds to the order.
•  Contents should include: 

 

- 1 x motorised changeover switch

 

- 1 x emergency handle and fixing clip

 

- 1 x quickstart instruction sheet.

Accessories

•  Bridging bars and connection kits.
•  Terminal shrouds.
•  Terminal shield.
•  Voltage sensing kit.
•  HZI911 interface.
•  Current transformers.

•  Plug-in optional modules: RS485 MODBUS 

communication, 2 inputs/2 outputs, Ethernet 

communication, Ethernet communi 

RS485 JBUS/MODBUS gateway, Analogue 

outputs, Pulse outputs.

This quick start is intended for personnel trained in 

the installation and commissioning of this product. 

For further details refer to the product instruction 

manual available on the hager website.
•  This product must always be installed and 

commissioned by qualified and approved 

personnel.

•  Maintenance and servicing operations should be 

performed by trained and authorised personnel.

•  Do not handle any control or power cables 

connected to the product when voltage may be, 

or may become present on the product, directly 

through the mains or indirectly through external 

circuits.

•  Always use an appropriate voltage detection 

device to confirm the absence of voltage.

•  Ensure that no metal objects are allowed to fall 

in the cabinet (risk of electrical arcing).

•  

For 800 – 3200A (Uimp = 12kV). Terminations 
must respect a minimum of 14 mm clearance 
from live parts to parts intended to be earthed 
and between poles. 

Failure to observe good enginering practises as 
well as to follow these safety instructions may 
expose the user and others to serious injury or 
death.

Installation and commissioning

Risk of electrocution, burns or injury to 

persons and/or damage to equipment.

 

Risk of damaging the device.

In case the product is dropped or 

damaged in any way it is recommended 

to replace the complete product

.

Step 1

Cabinet/

Back Plate

Installation

 

Step 2

Connecting the 

power section

 

Step 3

COMMAND/

CONTROL 

terminal

connections

 

Step 4

Power SUPPLY 

and controller 

terminal 

connections

 

Step 5

Check

   

Step 6

Programming

   

  Step 7A

 

AUT Mode

(Automatic 

Control)

  Step 7B

 

AUT Mode 

(Remote 

Control)

  Step 7C

 

Emergency

Manual

Operation

  Step 7D

 

Padlocking

z

Motorised source changeover switch

800A - 3200A

1  

Preferred source 

        2  Alternate source

&

 

 

Position 0 order

é

 

 

Position 1 order

"

 Position 2 order

'

 Zero position priority order

(

 Remote control enable (priority over auto)

§

 Product available output (Motor)

è

 Position II aux contact

!

 Position I aux contact

ç

 Position 0 aux contact

a

 O/P to HZI911 remote display

z

  Programmable output contact, by default set 

to ATS product available - Normally open

e

 to 

y

 programmable inputs 1-4

u

 and 

i

 programmable inputs 5-6

o

  Aux. supply (207/210) to be used with 

optional I/O modules

p

  Contact “Start/Stop Genset”: if S1 is not 

available the NC contact (71-72) is closed

q

  Contact “Start/Stop Genset”: if S1 is not 

available the NO contact (71-74) is open

s

  Option module slots 1 to 4

d

  Current Transformer incoming cable 

connections

f

  Voltage sensing inputs

g

 Power supply inputs

Example: control wiring for a 400 VAC application having a 3 phase and neutral supply

3. CONTROL/COMMAND terminals

Ensure that the product is in Manual Mode.

f

f

g

g

HZI911

4. Power supply, sensing and control wiring

Use cables with 1,5 to 2,5 mm

2

 section.

Screw M3

Tightening torque: min.: 0.5 Nm - max.: 0.6 Nm

+=,

%

%

3R

ZHU9a

3R

ZHU9a

ATS Power supply input II

Power supply II - L

Power supply II - N

208-277 VAC ±20% : 50/60 Hz

ATS Voltage sensing input 

Source supply II

S II - Phase 1

S II - Phase 2

S II - Phase 3

575 VAC (ph-ph) maxi

S II - Neutral

332 VAC (ph-n) maxi

Programmable inputs

To option module (-)/Common

Progr. inputs (208-209)

To option module (+)

Genset Start/stop 

N

C

Common

NO

ATS Power supply input I

Power supply I - L

Power supply I - N

208-277 VAC ±20% : 50/60 Hz

ATS Voltage sensing input 

Source supply I

S I - Phase 1

S I - Phase 2

S I - Phase 3

575 VAC (ph-ph) maxi

S I - Neutral

332 VAC (ph-n) maxi

ATS Module control inputs
(programmable)

ATS Module output control
(programmable)

Remote interface

RJ45 to HZI911

Current transformer incoming 

cable connections

Slot for optional modules

5. Check

Whilst in manual mode, 

check the wiring

 

and if ok power up

 

the product.

LED Green = 

 

“Power” : ON
LED Red =

 

“Manuel/Defaut”: ON

800 A

1000 

A

1250 

A

1600 A

2000 A

2500 A

3200 A

Minimum Cu 

cable section 

at Ith

(mm

2

)

2x185

-

Minimum Cu 

busbar section 

at Ith

(mm

2

)

2x50x5  2x63x5

2x63x7

2x100x5  3x100x5 2x100x10 3x100x10

Maximum Cu 

cable section (mm

2

)

4x185

6x185

-

Maximum Cu 

busbar width

(mm)

63

100

Type of screw

M8

M10

M12

Recommended 

tightening 

torque

(N.m)

8,3

20

40

Maximum 

tightening 

torque

(N.m)

13

26

45

Dimensions in mm

Door cut-out for front panel

2000A to 3200A

800A to 1600A

33

8.5

8.5

50

33

10

ø 9

ø 15

800A to 1000A

16 x 11

60

28.5

15.75

15.75

28.5
15

1250A

15

5

5

12.5

25

25

30

30

45

45

90

ø12.5

1600A to 3200A

T

250

C

21

28

0

C

21

25

0

M

T

51,5

M

51.5

800A

1000A

1250A

1600A

2000A

2500A

3200A

4P

M

335

467

T

80

120

C

391

523

Clip for 

storage 

of the 

emergency 

handle

6LE007790Aa

1

6LE007790Aa

2

6LE007790Aa

3

Отзывы: