7
3. Line up the red dots on the part F
hopper with the separator, then place
the hopper. Turn the hopper clockwise
to lock it in place.
4. Insert the part G pusher into the
funnel of the hopper. Place the part
H juice and pulp pitchers in their
designated place under the juice and
pulp spouts