background image

2 x Door connecting strips (E)

2 x M6 x 50 mm

Connecting bolt (I)

2 x M6 x 10 mm

Round head bolt (L)

1 x Guide roller (D)

12 x M5 x 6.0 mm

Round head bolt (M)

3 x Brackets (B)

3 x Plate  (C)

Tools required (Not Supplied)

Component parts

Height adjustable pull out larder unit:

Assembly guide

Sales and Technical Support - 

Tel: 01788 542020, Fax: 01788 544440, E-Mail: [email protected]

Sales and Technical Support - 

Tel: 01788 542020, Fax: 01788 544440, E-Mail: [email protected]

• 

Make sure all the components are included before 

you start.

• 

The number for technical support is at the bottom 

of the page.

• 

Don't rush!

• 

Read the instructions first.

• 

Assemble in the stages shown.

• 

Keep the fittings together to avoid loss.

• 

Have fun.

1 x Frame (A)

1 x Runner (F)

500.00-0102

Installed height 950 - 1200 mm = 3 baskets

Installed height 1200 - 1450 mm = 4 baskets

Installed height 1450 - 1700 mm = 4 baskets

Installed height 1700 - 1950 mm = 5 baskets

Installed height 1950 - 2200 mm = 5 baskets

2 x M8 x 40 mm

Round head bolt (J)

36 x M4 x 15 mm 

Pan head screw (N)

 48 mm pins

x 2 per basket (Q)

2 x M6 x 25 mm

Round head bolt (K)

pin caps

x 2 per pin (R)

8 x M5 x 10.0 mm

Flat head screw (O)

Check off components as shown in diagram and lay on flat surface

1

Basket (H)

Pencil

Bradawl

Spirit Level

Cross Head Screwdriver

Tape measure

 Did you know Häfele also supply tools to the trade and industry?

See www.hafele.co.uk for more information.

SW4 Allen key

FITT-10057

Issue - 01

3

Threaded hole bracket

Flat head screw

Working outside the carcase, secure the two part frame together by 

inserting one of the four connector strips into the bottom section of 

the frame and align the holes. BE CAREFUL NOT TO LET THE CONNECTORS 

SLIP DOWN INSIDE THE MAIN FRAME! Insert the one of the eight M5 x 10mm 

screws. Repeat this procedure for the other three frame connectors as shown 

in the drawing making sure the cut outs in the frame are on the same side top and

bottom, Slide the top section of the frame over the secured connectors 

aligning the holes and secure using the remaining four M5 x 10mm  screws. 

Make sure the screws are securely tightened before proceeding.

4 x Frame

connectors (G)

Содержание Height adjustable pull out larder unit

Страница 1: ...und head bolt J 36 x M4 x 15 mm Pan head screw N 48 mm pins x 2 per basket Q 2 x M6 x 25 mm Round head bolt K pin caps x 2 per pin R 8 x M5 x 10 0 mm Flat head screw O Check off components as shown in diagram and lay on flat surface 1 Basket H Pencil Bradawl Spirit Level Cross Head Screwdriver Tape measure Did you know Häfele also supply tools to the trade and industry See www hafele co uk for mor...

Страница 2: ...left hand and right hand runner F together and then secure the frame A to the runner F using 2 x M6 x 50 0 mm I bolt Make sure the front of the frame and front of runner line up Insert 2 x M8 x 40 0 mm bolts J as shown but do not tighten at this stage 5 Align runner F with the centre line on bottom panel and 6 mm from front edge of the carcase Use 10 x M4 x 15 0 mm pan head screws N to secure the ...

Страница 3: ...to each of the door panel hanging plates C then locate these screws into the door panel hanging brackets B attached to the main frame A Then secure the 2 x M5 x 6 0 mm round head screws M on each of the door panel hanging plates C 9 A 286 mm door overlay Installed unit height 950 1200 mm B 400 mm Installed unit height 1200 1450 mm B 624 mm Installed unit height 1450 1700 mm B 1024 mm Installed uni...

Страница 4: ...88 544440 E Mail info hafele co uk Sales and Technical Support Tel 01788 542020 Fax 01788 544440 E Mail info hafele co uk Steps 11 to 14 12 For vertical tilt alignment of the door loosen fixing bolts I and raise front or back of frame as necessary using adjusting bolts J Then re tighten fixing bolts I I I J J 13 Place the baskets H in the desired position on the frame using 2 x metal pins Q to han...

Отзывы: