5. Commissioning
The system is supplied in simple operation mode for stand-alone operation (SA). This
document describes the commissioning process for stand-alone operation only.
Start-up details for using the system with Dialock software applications can be found in the
Dialock software documentation.
The start-up process begins automatically once the power plug has been connected.
The individual steps must be carried out immediately and in sequence.
For safety reasons, the initial start-up can only take place within 5 seconds of plugging
in the power plug.
• Read through the steps carefully before commissioning.
• Have both master keys (“green” programming key and “red” erasing key) at the
ready before start-up commences.
• Perform the work operations quickly and without interruptions.
If the commissioning time window is exceeded:
1. Pull the power plug.
2. Wait until the LED goes out.
3. Restart the commissioning process.
Alternatively, start-up can also take place by pressing the Reset button
(
9. Extensions and connections, page 70
).
1. Press and hold down the reset button only until the first, short acoustic signal.
ATTENTION!
If the button is pressed for longer, a reset will take place
(
).
Recommendation: carry out a firmware update with the MDU 110 mobile
programming unit before starting up in order to ensure that the most up-to-date
DIALOCK firmware is on the terminal.