5.52.420.00.01.07
15
9.2.4
Wiring diagram
Wiring diagrams are situated in the terminal box or can be requested from HADEF by metioning of serial
number.
9.2.5
Assigning line cross-sections and fuses
Motor output
up to
kW
slow-blow
fuse
A
Cable cross-section mm
2
Cable length up to …m
1,5 2,5 4 6 10 16 25
3,9
10 58 97 155 232 388 620 969
5,9
16 36 60 97 145 242 388 606
8,4
20 29 48 77 116 194 310 485
8,9
25 23 38 62 93 155 248 388
11,9
32 18 30 48 72 121 194 303
18,5
35 16 27 44 66 110 177 277
--
50 11 19 31 46 77 124 194
--
36 9 15 24 37 61 98 154
9.3 Load
chain
Before commissioning the load chain must be aligned and oiled.
For the first commissioning of motorized hoists, chain oil is supplied with the delivery.
Move safety note and fixing wire away from the chain.
9.4
Power operated hoists with chain container:
Due to the transport and / or installation of the hoist on the beam, the position of the load chain in
the chain container can change unfavorably.
WARNING!
It is mandatory before the first commissioning:
that the complete load chain without load with the utmost care from the chain
container is driven
i.e. when lowering, pay special attention to the load chain on the chain container side,
so that the load chain can run properly through the hoist without being twisted
only after the chain container is completely empty, the load chain without load, can
be returned to the chain container
during the running in of the load chain, lubricate it over its entire length
CAUTION!
Do not use grease for lubrication of load chain.
Without lubrication, manufacturer's warranty and/or liability will be void.
NOTICE!
Continuous, thorough lubrication will increase the life of the chain considerably.