12
5.52.732.00.01.05
16.1
Temporary decommissioning
Measures are as above.
Also read the chapter “Transport and storage”.
16.2
Final decommissioning/disposal
Measures are as above.
After disassembly, ensure that the disposal of the equipment and any materials it contains is carried out
in accordance with environmental regulations.
17
Additional documents
17.1
Operating instructions for cranes
acc. to the accident prevention regulations for "cranes", are attached to the consignment or to the
documents.