![Hach QuikChem 8500 2 Series Скачать руководство пользователя страница 6](http://html2.mh-extra.com/html/hach/quikchem-8500-2-series/quikchem-8500-2-series_operations_3240682006.webp)
Figure 2 Mixing coil symbol
Injection valve symbols
Refer to
. The injection valve is on the left side of every channel of the system unit. The
numbers around the hexagon show the six ports on the valve. The zig-zag or the coil symbols show
the sample loops. The sample loop tubing is connected between ports 1 and 4. The length of this
tubing is shown on the manifold diagram. Refer to the QuikChem method. The lines that come out of
the hexagon are the Teflon tubing connected to the valve ports.
Figure 3 Injection valve symbols
1
Primary
2
Secondary
Pump and pump flow symbols
shows the reagent pump. The top arrow shows the pump flow direction. The line below this
refers to the rinse water line attached to the wash reservoir in the sampler. The wash line is
connected to the bottom nipple of the wash reservoir.
6
English
Содержание QuikChem 8500 2 Series
Страница 1: ...DOC022 97 80411 QuikChem 8500 Series 2 01 2016 Edition 2 Operations Fonctionnement Operaciones...
Страница 2: ...English 3 Fran ais 15 Espa ol 28 41 2...
Страница 41: ...41 50 Omnion 42 50 42 51 41...
Страница 42: ...Omnion Omnion Omnion MSDS SDS QuikChem FIA FIA 1 42...
Страница 43: ...1 1 7 2 8 3 9 4 10 5 11 6 6 12 0 8 mm Teflon QuikChem Teflon 2 2 3 1 4 QuikChem Teflon 43...
Страница 44: ...3 1 2 4 4 1 4 2 5 3 6 5 2 6 44...
Страница 45: ...5 1 3 2 4 T T 6 T T 6 T 1 T 3 2 T 7 60 40 QuikChem 7 8 1 46 47 45...
Страница 46: ...8 1 2 1 6 1 4 2 QuikChem 3 5 5 6 5 5 6 15 cm 0 8 mm Teflon 2 1 3 6 5 9 46...
Страница 47: ...9 1 4 2 5 3 10 10 1 4 2 5 3 47...
Страница 51: ...5 a b 6 7 8 60 C 140 F 60 C 140 F 1 10 2 11 3 12 4 NORMAL RUN 35 35 5 10 50 1 6 49 51 11 1 2 51...
Страница 52: ......
Страница 53: ......