![Hach PAT700 DS Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/hach/pat700-ds/pat700-ds_basic-user-manual_3196958016.webp)
Table 6 Sliding toolbar options (continued)
Icon
Function
Description
Diagnostics
General—Monitor lamp use and test, change or replace lamps.
Diagnostic tests—Test the pump, 4–20 mA output, digital I/O, plumbing, RS232, RFID,
fan and touchscreen calibration.
Calibration—See the calibration dates.
Data review
Review, print or export data.
Sign on or off If password security is enabled, users must use a password to make operation
changes. Log off to prevent access to system changes.
Note: If a user is signed on remotely, the user cannot be signed off locally. If a user is signed on
locally, the user cannot be signed off by a remote user.
Startup
Connect to power
After plumbing and wiring are complete, connect the instrument to power. For the location of the
power switch and power cord, refer to
on page 11.
1.
Connect the power cord to a power outlet with a safety ground.
2.
Toggle the power switch to on.
3.
Make sure that the startup screen shows on the display.
Set the sample flow rate
Adjust the flow rate before initial operation. Refer to
on page 3 for sample
requirements. For hot water applications, a flow rate of 60 mL/minute is recommended.
Note: The flow rate changes with water pressure, so it may not be possible to get the same flow rate for both
sample streams.
1.
Push
<<
to show the sliding menu.
2.
Push
RUN MODE
.
3.
Select
Standby
.
Note: In Standby, water continues to flow through the instrument.
4.
Use a graduated cylinder to measure the amount of water that drains from the instrument in
15 seconds.
5.
Use the flow control valve to adjust the flow rate. Refer to
16
English
Содержание PAT700 DS
Страница 2: ...English 3 Français 26 Español 50 Português 74 中文 98 中文 121 日本語 144 한글 167 2 ...
Страница 9: ...Figure 2 Installation dimensions English 9 ...
Страница 32: ...Figure 2 Dimensions de l installation 32 Français ...
Страница 56: ...Figura 2 Dimensiones de instalación 56 Español ...
Страница 80: ...Figura 2 Dimensões de instalação 80 Português ...
Страница 104: ...图 2 安装尺寸 104 中文 ...
Страница 109: ...d 如有必要 请缓慢地紧固压式管件以阻止泄漏 图 6 垂直连接仪器 1 工艺管道 4 排水管 英寸外径 2 隔离阀 客户提供 5 排水 3 入水管 英寸外径 外径 用户界面及导航 启动后 用户界面会显示起始屏幕 请参阅图 7 中文 109 ...
Страница 127: ...图 2 安裝尺寸 中文 127 ...
Страница 132: ...d 必要時慢慢地將壓縮配件鎖緊 使水不再滲漏 图 6 為儀器配管 1 製程導管 4 in 外徑排水管路 2 客戶自備的隔離閥 5 排水 3 in 外徑入水管路 用戶介面與瀏覽 啟動後 用戶介面會顯示首頁畫面 請參閱图 7 132 中文 ...
Страница 150: ...図 2 取り付け寸法 150 日本語 ...
Страница 173: ...그림 2 설치 치수 한글 173 ...
Страница 190: ......
Страница 191: ......