69
Figure 20
Pump Module and Electrical Connections
5.7.1
Line Voltage Selection for Electrolyte Pump
Note: Misapplication of AC
line power to this
instrument can cause
damage to the instrument.
Prior to connection, verify
that the Voltage Select
Switch is set for the proper
AC line requirement.
This instrument is factory set and properly fused for 115 Vac line requirements. To convert
the instrument for 230 Vac line requirements, proceed as follows:
1. Slide the actuator to the 230 V position (Figure 20).
2. Remove fuses F1 and F2 (Figure 20) and replace them with 0.1A fuses (refer to
Содержание EC1000
Страница 2: ...2...
Страница 8: ...8...
Страница 12: ...12...
Страница 14: ...14...
Страница 16: ...16...
Страница 18: ...18 Figure 1 Controller Front Panel...
Страница 20: ...20 Figure 2 Pump Module...
Страница 24: ...24 Figure 6 pH Control Loop...
Страница 54: ...54...
Страница 56: ...56...
Страница 58: ...58 Figure 12 Controller Installation Panel Mount...
Страница 61: ...61 Figure 15 Installing the pH ORP Electrode Figure 16 Flow Thru Cell...
Страница 70: ...70...
Страница 73: ...73 6 4 Calibration See Section 2 3 Calibration Figure 21 Priming Tee Operation...
Страница 74: ...74...
Страница 80: ...80...
Страница 83: ...83 Figure 24 Sensor Replacement...
Страница 85: ...85 Figure 25 Hach One pH Process Electrode...
Страница 89: ...89 Figure 26 Pump Module Plumbing Diagram...
Страница 102: ...102...
Страница 103: ......
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 108: ...108...
Страница 112: ...112...
Страница 116: ...116...
Страница 122: ...122...
Страница 123: ...123...
Страница 124: ......