Now check again that the whole structure is perfectly square, that the doors can be opened and closed properly
and that the gable follows the lines of the front and back wall- if all this is all right, work can commence on the
roof.

followed by the

to form a firm surface (not too tight),

All the profiled boards should be nailed securely to the

walls, gables and purlins - please trim the last boards (for example, using a fretsaw) for a flush edging on the
outer rim of the purlin/roof edge.

The roof boards have slightly rounded corners in the front side and chamfers and one groove in the back

side. They are assembled the rounded side downwards and the side with the chamfers and the groove upwards.

Attach the fascia boards C4 flush with the roof -

. Then the work can begin on the roofing shingles.

Here again, any unevenness caused by the planer, rough edges etc. even in the grooves and tongues, are
due to well-tried production techniques and quite normal and not a reason for reclamation.

Begin with the 2 profiled boards, with the groove pointing outwards, on the outer edge of the purlins/the
top edge of the roof C3;

other profiled boards,

diagram 5. The entire roof should be checked for parallel eaves, a uniform overhang over the walls and
an even, firm support in the case of the purlins.

A firm, durable anchoring of the roof is important for the stability of the

cabin as a whole!

Take care when you work! The roof is not intended for standing on!

diagram 6

Important!

After nailing the roof boards they must be covered immediately!

Roofing

6.

C4

A6/B3

A7/B4

Start

Finish

Sawing
direction

8

Luzern

271205

Содержание Luzern 727

Страница 1: ...spruce wall boards Dimensions of pedestal Outer dimensions incl roof overhang Area of roof Height of ridge 1 glazed door width x height 2 glazed windows width x height Height of side walls All measure...

Страница 2: ...tor is recommended or paint please take notice of the recommendations of the varnish or paint manufacturer It is not advisable to paint the wall timbers before assembling them this is best done when t...

Страница 3: ...3 1 Side walls C Rear wall B Front wall A Luzern 271205...

Страница 4: ...base forthe floor joists and is also good forventilation lengthwise diagram 2 Pre sorting 2 4 Pre sorting you don t need to worry about the number of parts when you open the package Please refer to fo...

Страница 5: ...ere in the assembly process To avoid damage we have enclosed wooden blocks marked with an X to be placed on the planks for protection purposes the ends of the timbers protruding at the corners require...

Страница 6: ...nt for a log cabin structure your summer house will settle up to 3 4 cm during the course of the different seasons and varying weather conditions To allow for this there has to be some otherwise the h...

Страница 7: ...dunderextremeweatherconditions andadjustingthemas required This should be done by adjusting the whole frame using gentle taps of the rubber mallet please use wooden blocksinbetween or by tighteningor...

Страница 8: ...ve upwards Attachthefasciaboards C4 flush withtheroof Thenthework canbeginon theroofingshingles Here again any unevenness caused by the planer rough edges etc even in the grooves and tongues are due t...

Страница 9: ...ling of the first row of shingles position the next row in alignment with the previous row the next row must also cover the nails of the previous row Continue installation in accordance with Pic B Cut...

Страница 10: ...ing enclosed bolts with the nuts facing inwards It is important not to tighten the top nuts too firmly toallowthestructureroomto settle screw thestrips down firmlyusing theremainingbolts Please take c...

Страница 11: ...n when removing and replacing the window cross since it is a tightfit Regular visual checks help to avoid damage before it occurs Please remember that fitting adjustments to the differentpartsareanuna...

Страница 12: ...List of parts 10 12 Luzern 271205...

Отзывы: