
9
C
.
Wiring
1) Connect to appropriate power supply, the voltage should comply with the
rated voltage of the products.
2) Earth the machine well.
3) Wiring must be handled by a professional technician according to the
circuit diagram.
4) Set leakage protector according to the local code for wiring (leakage
operating current ≤ 30mA).
5) The layout of power cable and signal cable should be orderly and not
affecting each other.
D
.
Switch on after finishing all wiring construction and re-checking.
Содержание 1436 103290
Страница 1: ...Eco 1436_103290_103291_103292...
Страница 19: ...17 XI Annexe 1 Sch ma de c blage pour le contr le externe Optionel...
Страница 20: ...18 XII Annexe 2 Sch ma de c blage pour le contr le externe Optionel...
Страница 22: ...Ecoline Inverter INSTALLATION AND USER MANUAL INVERTER SWIMMING POOL HEAT PUMP FR EN DE IT ESP...
Страница 40: ...17 XI Appendix 1 Heating priority Optional...
Страница 41: ...18 XII Appendix 2 Heating priority Optional...
Страница 43: ...0 Ecoline Inverter INSTALLATIONS UND BENUTZERHANDBUCH Inverter W rmepumpe f r Swimmingpool FR EN DE IT ESP...
Страница 61: ...18 XI Anhang Schaltplan f r Zwangseinschaltung der Filterpumpe Optional...
Страница 62: ...19 XII Anhang Schaltplan f r Zwangseinschaltung der Filterpumpe Optional...
Страница 64: ...MANUALE D INSTALLAZIONE ED USO Pompa di calore per piscina dell inverter FR EN DE IT ESP Eco Inverter...
Страница 86: ...Bomba de calor de la piscina del inversor MANUAL DE USUARIO E INSTALACI N Eco Inverter FR EN DE IT ESP...
Страница 104: ...17 XI Ap ndice 1 Diagrama de cableado de prioridad del calentamiento opcional...
Страница 105: ...18 XII Ap ndice 2 Diagrama de cableado de prioridad del calentamiento opcional...
Страница 107: ......
Страница 108: ...Version Cf 7IN...