HAAS + SOHN HSP 4.0-F2 Скачать руководство пользователя страница 9

Cleaning

work

GB

5

3. Cleaning work

WARNING

Before starting any cleaning work, the stove must be cool down!
Once the cleaning work is completed, the correct operating status of the device must be re-
established: Put the combustion pot in correctly, close the combustion chamber door.

3.1. Cleaning the surface

Dirt on the upper surface of the stove may be cleaned off with a damp cloth or if necessary with mild soapy
water. You are advised against using corrosive cleaning agents and solvents since these might damage the
surfaces.

3.2. Cleaning the glass panel

To clean the viewing panel, you must first open the stove door. Dirt on the glass panel can be removed with a
glass cleaner or with a damp sponge on which you have sprinkled some of the wood ash present.
(Environmentally friendly). Cleaning the glass panel may only be done with a cooled down stove in the OFF
operating mode.

3.3. Clean combustion chamber “function instruction” Error
F040

• The whole combustion space must be cleaned after

50-hours operation at the latest, or once a week

.

• The requirement to clean the fire-box (flickering of the display) appears during heating, in case that the

cleaning interval has elapsed.

• After the fire-box has been cleaned, the error message "Clean the fire-box" will be confirmed automatically.

The condition for automatic confirmation of this error message is that the fire-box door is opened for more
than

60 seconds

. This time is necessary for careful cleaning of the fore-box, including the burner.

• This reset of the operating hours counter occurs even if the cleaning of the combustion chamber is

performed before the 30 operating hours have run provided that the stove is in “Off” operating status and the
door is open for longer than 60 seconds during cleaning.

3.4. Cleaning the combustion pot - weekly

During operation, deposits may form in the combustion pot. How quickly the combustion pot becomes dirty
depends solely on fuel quality. The deposits or encrustations must be removed from time to time.

WARNING

If this is not done, the clinker will continue to accumulate. Then the device will no longer be able to ignite
properly. Pellets can pile up in the combustion pot. In extreme cases, this can reach all the way back to the
pellet chute. Backfire in the pellet container and smouldering in the pellet tank might possibly result.

This will destroy your device and is not covered in your guarantee.

Содержание HSP 4.0-F2

Страница 1: ...HSP 4 0 F2 Equipment sheet Pellet stove GB 0545608001403d Equipment sheet HSP 4 0 F2...

Страница 2: ...he heating device or of an injury The note entitled Notice advises you on possible damage to your heating device The note entitled Important calls your attention to the information important for the o...

Страница 3: ...Error F040 5 3 4 Cleaning the combustion pot weekly 5 4 Maintenance work 8 4 1 Cleaning of the ash pan once a week 8 4 2 Cleaning the flue gas passes 9 4 2 1 Cleaning the flue baffle 10 4 3 Cleaning...

Страница 4: ......

Страница 5: ...e gas 80 mg Nm 75 mg Nm 55 mg Nm OGC level in flue gas 3 mg Nm 8 mg Nm 12 mg Nm Proportion of dust in flue gas 4 mg Nm 10 mg Nm 9 mg Nm Contents of storage container pellet tank about 40 kg Duration o...

Страница 6: ...Dimensions GB 2 2 Dimensions 2 1 Flue pipe conn on the top Pos 1 for external air input Pos 2 convection air for 2nd room Pos 3 flue pipe inner diameter 80 mm...

Страница 7: ...Dimensions GB 3 2 2 Flue pipe conn rear Pos 1 for external air input Pos 2 convection air for 2nd room Pos 3 flue pipe inner diameter 80 mm...

Страница 8: ...Dimensions GB 4 2 3 Flue pipe conn concentrique Pos 1 for external air input Pos 2 convection air for 2nd room Pos 3 flue pipe inner diameter 80 mm...

Страница 9: ...e display appears during heating in case that the cleaning interval has elapsed After the fire box has been cleaned the error message Clean the fire box will be confirmed automatically The condition f...

Страница 10: ...only be done with a cooled down stove in OFF operating mode Otherwise there is a risk of burns Clean the burner with the supplied tool By scraping the burner wall dirt falls down through the cleaning...

Страница 11: ...Cleaning work GB 7 Figure 1 Cleaning the combustion pot using the supplied tool...

Страница 12: ...pellet quality ash content Quality pellets have a low ash content of about 0 2 0 3 However if the ash content is higher 0 5 and over the interval from maintenance to maintenance is reduced and the ac...

Страница 13: ...nd flue gas ducts at the latest after 1000 kg of pellets have been consumed Clean with a brush or an ash extractor CAUTION After completion of the cleaning make sure that when putting back the covers...

Страница 14: ...ng 1000 kg of pellets or after a year of operation it is necessary to clean the deflector using the enclosed tool CAUTION To remove the deflector you must retract the flame temperature sensor otherwis...

Страница 15: ...1 in the pellet tank may be removed Then clean the tank and the intake of the screw conveyor housing with a vacuum cleaner After cleaning it is essential to put back the protective grille When doing...

Страница 16: ...parts list 5 1 Replacement parts list without trim parts Pos Description Piece No PR Replacement parts list without trim parts A1 Complete combustion chamber door anthracite 1 piece 0545508005300 1 As...

Страница 17: ...al tank cover 910 mm 1 piece 0561008006197 14 Tank cover black glossy 1 piece 0545608005681 15 Grip 1 piece 0545608005218 16 Operator console 1 piece 0545508005600 17 Upper screw conveyor bearing 1 pi...

Страница 18: ...Cover 1 piece 0545508025087 35 Stand 6 piece 0551908506005 36 Flue way S bend 1 piece 0545508006123 37 Flue way bend 1 piece 0545508006145 38 Flue way T piece 1 piece 0545508006120 39 Condensate colle...

Страница 19: ...0005 43 Door glass 4x239x376 1 piece 0545908005313 5 3 Replacement parts list Pos Description Piece No PR Replacement parts list 44 Side wall right black glossy 1 piece 0545608005130 44 Side wall righ...

Страница 20: ...25110 47 Side wall left black glossy 1 piece 0545608005121 47 Side wall left grey 1 piece 0545608015121 47 Side wall left white 1 piece 0545608025121 48 Cover plate left black glossy 1 piece 054560800...

Страница 21: ...Circuit diagram GB 17 6 Circuit diagram 6 1 Circuit diagram IO 57 1...

Страница 22: ...peed 18 19 Open window detection option 22 23 Tank cover 26 27 Door contact switch 28 29 35 Human presence detection option 30 31 Flue gas temperature sensor 32 33 Flame temperature sensor 38 39 Room...

Страница 23: ...raun Schwarz Steuer platine Schnecke Steuer platine Steuer platine Description circuit diagram No Description cable harness A1 A2 Control board 11 Control board 12 Screw conveyor motor Description cir...

Отзывы: