![Haag-Streit IM 900 Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/haag-streit/im-900/im-900_installation-manual_575767005.webp)
© HAAG-STREIT AG, 3098 Koeniz, Switzerland
–
HS-Doc. No. 7220556
5
2.
Installation
FORBIDDEN!
It is prohibited to disassemble any parts other than described in this manual. If not followed, all warranty claims
are void.
ESD
–
Electrostatic Discharge!
Electronic circuits of the IM 900 are sensitive to electrostatic discharges. ESD
–
Electrostatic Sensitive Device
–
,
The technician must be grounded for all repairs. Keep parts sensitive to electrostatic discharges in static
shielding bags for storage, transportation and shipping.
Attaching the label for automatic left/right detection
NOTE!
Clean the table surface before positioning the side identification sticker (1022535) Make sure that no oil and
grease residue remains on the surface.
NOTE!
Make sure you use side identification sticker (1022535) together with RM02.
1.
Protective film
2.
“Positioning tool” sticker
3.
Roller rail
4.
Table
5.
Rail cover
Fig. 1
•
Remove the rail cover (5) and move away the slit lamp. Clean surface of table.
•
Remove protective film (1) from the back of the sticker. Start lifting it off carefully from the corner opposite the black area.
•
Position the sticker against the right roller rail (3) and the edge of the table (4). Press the white-black surface, smooth out air
bubbles.
•
Carefully tear off the rest of the 'Positioning Tool' sticker (2) along the perforations.
•
Mount the slit lamp and rail cover again.
1
2
3
4
5
Содержание IM 900
Страница 11: ......