10
Accessories
Grounding
cable
M6 screw (user
supplied)
Cage nut (user
supplied)
M4 screw
Front mounting
bracket
Rubber feet
Bail latch
Console cable
Checklist before installation
Table 6
Checklist before installation
Item Requirements
Result
Installati
on site
Ventilation
•
There is a minimum clearance of 10 cm
(3.9 in) around the inlet and exhaust
vents for heat dissipation of the wireless
switch chassis.
•
A ventilation system is available at the
installation site.
Temperature
0°C to 45°C (32°F to 113°F)
Relative
humidity
5% to 95% (noncondensing)
Cleanness
•
Dust concentration
≤
3 × 10
4
particles/m
3
•
No dust on desk within three days