2-1
2
Installing the AP
Installation flowchart
Figure 2-1 Installation flowchart
Pre-installation tasks
Before installing the AP, perform the following tasks:
•
Power on the AP and connect the AP to the network. Examine the LEDs to verify that the AP is
operating correctly. For information about the LEDs, see "
."
•
Record the MAC address and serial number of the AP for future use.
Mounting the AP
1.
As shown in
, use M4 screws to attach the mounting bracket to an electrical outlet
box.