Installation preparations
This chapter describes the preparations for WA2200 installation, including unpacking and
inspection, preparation of installation tools, and environment examination.
WARNING!
Installation and removal of the unit and its accessories must be carried out by qualified personnel. Read
all Safety Instructions supplied with your device before installation and operation.
Unpacking and inspection
Before unpacking the package, ensure that the package is not damaged and that it does not
show signs of water damage. While opening the package and removing the contents, avoid
using excessive force.
The accessories vary with the models. For the exact contents of the package, refer to the
packing list. If the contents do not match the packing list, contact your H3C representative.
If the package is found to be rusted or water soaked, stop unpacking and contact your H3C
representative immediately.
Installation tools
When installing the AP, you may need the tools listed in Table 2 Select the appropriate tools
according to your installation environment.
NOTE:
The table below is only for reference. If you install the AP on a desk, none of the tools are required; if you
install the AP on or under a building eave, no digging tool is required.
Table 2
List of installation tools
Type of tool
Indoor installation
Outdoor installation
General
tools
1-meter-long ruler, marking pen, knife,
and percussion drill with matching drills
Digging tool, adjustable spanner,
and vices
Special tools
Cable stripper, crimping pliers, and
RJ-45 crimping pliers
Cable stripper, crimping pliers,
RJ-45 crimping pliers, waterproof
tape, and fiber fusion splicer
Auxiliary
tools
Ladder and rubber hammer
Ladder
Installation site examination
Before installation, examine the installation site to ensure that the AP is in a good operational
environment. Examine the installation site from the following two aspects: installation site
selection and temperature and humidity requirements. For details about temperature and
humidity requirements, see ―Temperature and humidity requirements.‖
Avoid locations that are susceptible to high temperature, dust, flame, explosives,
electromagnetic interference (high power radar, radio station, and transformer), unstable
voltage, heavy vibration, or loud noise. The installation site should be dry, without any leakage,
dripping, or dew. The AP should be at least 500 m (0.31 mi) away from a shore and should not
face the direction of onshore wind.