background image

 

2.

 

Put on the wrist strap. 

3.

 

Tighten the wrist strap to keep good skin contact. 

4.

 

Insert the ESD-preventive wrist strap into the ESD port on the gateway chassis. 

Figure 8

 

Attaching an ESD-prevent wrist strap (on an M9006) 

 

 

Installing MPUs/LPUs/switching fabric modules 

 

 

IMPORTANT: 

 

The device is shipped with no filler panels on some card slots. The figures in this document are for 

illustration only. 

 

The switching fabric modules of the M9010 and M9014 have protection boxes when shipped. Before
you install a switching fabric module, pull the ejector levers on the module outwards, and then pull

it out of the protection box. 

 

The installation procedures for MPUs, LPUs, and switching fabric modules are the same. Unless otherwise 
stated, MPUs, LPUs, and switching fabric modules are collectively referred to as "cards" in this document. 
These cards are either horizontally oriented or vertically oriented. When installing a card in a horizontal 

slot, make sure its PCB faces up. When installing a card in a vertical slot, make sure its PCB faces left. 
This section takes installing a horizontally oriented card as example.  
To install a horizontally oriented card: 

1.

 

Select the slot to install the card, and remove the blank filler panel (if any) from the slot. 

2.

 

Hold the card by the front panel with one hand and support the card bottom with the other. Slide 
the card steadily into the slot along the guide rails. 

3.

 

When most part of the card is inserted in the slot, press the ejector levers on the card outward. 

4.

 

Push the card until the positioning pin on card touches the hole on the chassis. 

5.

 

As shown in callout 2 on 

Figure 9

, press the ejector levers inward until the ejector levers touch the 

panel tightly and the card seats into the backplane  

6.

 

As shown in callout 3 on 

Figure 9

, fasten the captive screws on the card. 

Содержание SecPath M9000 Series

Страница 1: ...H3C SecPath M9000 Multi Service Security Gateway Series Installation Quick Start New H3C Technologies Co Ltd http www h3c com hk Document version 6PW104 20170414...

Страница 2: ...her trademarks that may be mentioned in this manual are the property of their respective owners Notice The information in this document is subject to change without notice Every effort has been made i...

Страница 3: ...rackets 4 Mounting the gateway to the rack 5 Grounding the gateway 6 Installing FRUs 6 Attaching an ESD preventive wrist strap 6 Installing MPUs LPUs switching fabric modules 7 Installing a power modu...

Страница 4: ...he gateways to be installed is no higher than the available installation height of the rack and enough clearance is reserved for cable routing The gateway is ready for installation and has been carrie...

Страница 5: ...cage nut 3 Install cage nuts on the square holes on each rack post Figure 2 Installing cage nuts M9006 as an example Installing cable management brackets Cable management brackets signal cable and pow...

Страница 6: ...milar procedure For more information see Figure 4 To install a cable management bracket 1 Unpack the cable management brackets 2 Attach the cable management bracket to the chassis and align the screws...

Страница 7: ...art of the chassis Installing mounting brackets Marks L and R are printed inside the mounting brackets to distinguish between the left and right mounting brackets To install the mounting brackets face...

Страница 8: ...the gateway on the slide rails or rack shelf and slide the gateway along the slide rails until the mounting brackets on the gateway touch the front rack posts The handle of an M9006 is located at the...

Страница 9: ...e dual hole terminals of the grounding cable into the grounding holes of the chassis 4 Connect the ring terminal of the grounding cable to the grounding post of the grounding strip and fasten the grou...

Страница 10: ...rds in this document These cards are either horizontally oriented or vertically oriented When installing a card in a horizontal slot make sure its PCB faces up When installing a card in a vertical slo...

Страница 11: ...on only To install the power module 1 Use a Phillips screwdriver to loosen the captive screws on the blank filler panel if any to remove the blank filler panel 2 Unpack the power module 3 Follow the i...

Страница 12: ...G Before you connect the power cable make sure the circuit breaker on the power cable is switched off To connect the power cable 1 Plug the power cable into the power receptacle of the power module 2...

Страница 13: ...the power receptacle of the power module 2 Fasten the screw to secure the power cable Figure 13 Connecting the power cable on an M9010 1 Insert the power cable plug into the power module 2 Fasten the...

Страница 14: ...s catch in the slot For a QSFP module that uses a plastic pull latch skip this step QSFP modules use either a metal or plastic pull latch They are installed in the same way except that you must pivot...

Страница 15: ...en you disconnect the cable first disconnect from the gateway Obtaining documentation To access the most up to date H3C product documentation on the H3C website at www h3c com hk 1 Go to http www h3c...

Отзывы: