background image

Powering on the switch and verifying its operation 

交换机上电并检查

Make sure the power cords are connected correctly and the power source is operating correctly. Then power on 
the switch. Verify that the switch is operating correctly by observing the LEDs on the switch. For more information 
about the LEDs, see 

H3C S7500X Switch Series Installation Guide

确认电源线已经正确连接到外部供电系统且供电系统已正常供电,使设备上电。请您根据设备各部件的指示灯正常
状态来检查设备是否正常。关于设备指示灯状态的详细描述,请您参见《

H3C S7500X

系列交换机 安装指导》中的

“附录

产品指示灯介绍”。

7

USB console port
USB Console

接口

Console port

Console

接口

Connecting the power cord for a PSR1200-D power module  

连接

PSR1200-D

电源线

Connecting the power cord for a PSR320-D/PSR650-D/PSR650C-12D power module 

连接

PSR320-D/PSR650-D/PSR650C-12D

电源线

3

2

1

4

5

1

2

3

Connecting the power cord for a PSR1400-D/PSR1400-12D1/PSR2500-12D power module  

连接

PSR1400-D/PSR1400-12D1/PSR2500-12D

电源线

To access the switch for the first time, use a console cable to connect the console port or USB console port 
on the switch. If you connect both the console port and USB console port, only the USB console port is 
available.  

当您首次登录设备时,只能通过

Console

/

USB Console

口登录。如果

Console

口和

USB Console

口同时连

接电缆,仅

USB Console

口可以正常通信。

Connecting the console cable

配置电缆连接

Accessing the switch 

1

2

3

5

6

4

Copyright © 2016-2021, New H3C Technologies Co., Ltd.

The information in this document is subject to change without notice.

Copyright © 2016-2021

新华三技术有限公司 版权所有,保留一切权利。

如需了解产品及安装方面的更多信息,请登录

H3C

网站

www.h3c.com

Отзывы: