background image

Installation accessories

安装附件介绍

Wear an ESD wrist strap, and make sure the wrist strap makes good skin contact and is 
reliably grounded.

操作者需佩戴防静电腕带,确保防静电腕带与皮肤良好接触,并确认防

静电腕带已经良好接地。

The installation tools are not provided with the switch. Prepare them yourself.

交换机不随机提供安装工具,请用户根据实际安装需求自己准备安装工具。

Phillips screwdriver

十字螺丝刀

ESD wrist strap

防静电腕带

Tool list

工具参考

Grounding screw

接地螺钉

Mounting brackets

挂耳

Removable cable tie

可拆卸式扎带

Chassis rail and slide rail

滑道和导轨

M4 screw

M4

螺钉

M6 screw and cage nut (user supplied)

 M6 

螺钉和浮动螺母(用户自备)

Power module filler panel 

电源假面板

Installation positions for accessories

附件安装位置介绍

To install the slide rails, chassis rails, and mounting brackets to the switch, you can 
choose the installation positions for these accessories. 

利用滑道、滑道导轨配合挂耳

将交换机安装到

19

英寸机柜时,可以根据需要调整附件在交换机上的安装位置。

The S6800-32Q provides a grounding sign at the primary grounding point, but does not 
provide it at the auxiliary grounding point. S6800-32Q

主接地点标有接地标识,备用接地点

上无接地标识。

The two grounding screws at the primary grounding point also apply to the auxiliary 
grounding point.S6800-32Q

主接地点上的两个接地螺钉同样适用于备用接地点。

2

1

H3C S6800-32Q Switch Installation Quick Start-6W106
H3C S6800-32Q

交换机 快速安装指南

-6W106

!

Marker

记号笔

Grounding cable

接地线

!

Mounting bracket installation position (two options)

挂耳安装位(二选一)

Near the network ports

安装在靠近端口侧

Near the power modules

安装在靠近电源侧

Chassis rail installation position (two options)

滑道导轨安装位(二选一)

Near the power modules

靠近电源侧

Near the network ports

靠近端口侧

Grounding cable installation position (two options)

接地线安装位(二选一)

Primary grounding point

 (near the power modules)

主接地点(靠近电源侧)

Auxiliary grounding point 

(near the network ports)

备用接地点(靠近端口侧)

The switch provides three holes for installing mounting brackets near the network ports.

端口侧的挂耳安装孔只有三个。

!

Содержание S6800-32Q

Страница 1: ...装到19英寸机柜时 可以根据需要调整附件在交换机上的安装位置 The S6800 32Q provides a grounding sign at the primary grounding point but does not provide it at the auxiliary grounding point S6800 32Q主接地点标有接地标识 备用接地点 上无接地标识 The two grounding screws at the primary grounding point also apply to the auxiliary grounding point S6800 32Q主接地点上的两个接地螺钉同样适用于备用接地点 2 1 H3C S6800 32Q Switch Installation Quick Start 6W106 H3C S6800 32Q交换机 快速安...

Страница 2: ... grounding cable before installing the switch to the rack 为了防止机箱安装到 机柜后无法安装接地线 因此请先将接地线安装到交换机的侧面接地点上 Install the cage nuts to the square holes of the rack 安装浮动螺母到机柜方 孔条上 Mount the switch to the rack two options 安装交换机到机柜 二选一 Connect the other end of the grounding cable to the grounding point on the rack 接地线另一端连接到机柜接地点 Near the power modules 挂耳在靠近电源侧安装位 Connect the other end of the grounding cable t...

Страница 3: ...ely when the ambient temperature is above 27 C 80 6 F 交换机运行过程中 如果一个风扇模块出现故 障 则当环境温度不高于27 时 必须在24小时内完成故障风扇模块的更换 且更换前必 须保持故障风扇模块在位 当环境温度高于27 时 请立即进行更换 Install a filler panel to the empty power module slot to ensure good ventilation and prevent dust from entering the chassis 若电源模块插槽没有安装电源模块 请及时安装假面板 以保证设备的良好通风散热并防止灰尘进入交换机 The S6800 32Q adopts the front to back airflow design You can choose different ...

Страница 4: ...the power cord The method for securing AC and DC power cords are the same The following figure uses the AC power cord as an example 使用可拆卸式扎带固定电源线 以防止电源线脱落 直流电源线和交流电源线的固定方式相 同 此处以交流电源线为例介绍电源线的固定过程 Before connecting the power cord connect the grounding cable and make sure the switch is reliably grounded 在连接电源线前 需先连接保护地线 保证交换机正确接地 Connect the power cord to the switch first and then to the power sourc...

Отзывы: