
13
4.
Mount the switch chassis in the rack:
a.
Install cage nuts (user-supplied) in the mounting holes in the front rack posts. Make sure the
corresponding cage nuts on the front and rear rack posts are at the same height.
b.
One person supports the chassis bottom with one hand, holds the front part of the chassis
with the other hand, and pushes the chassis into the rack gently.
Make sure the shoulder screws closely contact with the upper edges of the rear mounting
brackets, as shown in
and
c.
The other person uses M6 screws (user-supplied) to attach the front mounting brackets to
the front rack posts. Make sure the switch is installed securely in the rack.
Figure 16 Mounting the switch in the rack (with the wide flange of the mounting brackets
inside the rack)
Figure 17 Mounting the switch in the rack (with the wide flange of the mounting brackets
outside the rack)
Содержание S5130-HI Series
Страница 23: ...16 Figure 20 Mounting the switch in the rack 1 Figure 21 Mounting the switch in the rack 2...
Страница 40: ...33 Figure 46 Installing an expansion card LSWM2SP2PM Figure 47 Installing an expansion card LSPM6FWD 1 2 3 4...
Страница 51: ...44 Figure 57 Connecting the switches in one rack 1 2 3 4 5 6 7 8 9...
Страница 89: ...82 Figure 81 Airflow through the S5130 54C HI switch Figure 82 Airflow through the S5130 54QS HI switch...