Manual version: AW100-20220823
iii
Figure 4 Determining the bottom-support rail installation position on a rack post
4.
Mark the square holes at the same height on the other three rack posts. You only need to mark
the uppermost square holes and lowermost square holes for installation.
Install two cage nuts at a distance of 1U between them on each rack post. Make sure the
corresponding cage nuts on the left and right rack posts are at the same height.
5.
Align the bottom-support rail installation holes on the front end of the bottom-support rail with
the cage nuts on the front rack post. Use two screws to secure the front end of the
bottom-support rail to the front rack post, as shown by callout 1 in
6.
Keep the bottom-support rail horizontally and adjust its length until the bottom-support rail
installation holes on the rear end of the bottom-support rail engage the cage nuts on the rear
rack post. Use two screws to secure the rear end of the bottom-support rail to the rear rack post,
as shown by callout 2 in
7.
to install the other bottom-support rail. Make sure the two bottom-support
rails are at the same height so that the device can be placed on them horizontally.
Figure 5 Using screws to secure the bottom-support rails to the rack posts
NOTE:
To ensure the weight bearing capacity, make sure each installation hole in the bottom-support rails
has a screw attached.