1-5
Installation tools
No installation tools are provided with the router. Prepare them yourself as required.
Figure1-2 Installation tools
Installation accessories
Figure1-3 Installation accessories
Pre-installation checklist
Table1-4 Pre-installation checklist
Item
Requirements
Result
Installation site
Ventilation
•
A minimum clearance of 100 mm (3.94 in) is
reserved around the air inlet and outlet vents.
•
The installation site has a good ventilation
system.