
SECTI
ON
2
: I
NSTA
L
L
AT
IO
N
9
H2O BOILER
HC SERIES IOM Manual
2.1
Water Heater/ Boiler Package
Upon the receiving and unpacking of the equipment, check for any sign of damages, hit or dents.
Pay special attention to the gas train parts and safety devices installed. Verify total number of
pieces being shipped with the packing slip. All safety devices will be installed at the factory.
Each unit is supplied with:
Burner/ Blower.
Inlet and outlet manifolds.
High temperature cut off switch with manual reset.
Operating temperature controller.
Pressure relief valve.
Fully assembled gas train.
One Temperature sensor installed on the outlet manifold
Condensates drain kit.
Flame sensor (inside burner).
Flue gas connection.
Pressure-Pressure/temperature gauge.
All Safety features as described in
Section 1.3.
Please contact
H2O BOILER
if items listed above are missing. Please be familiar with major
parts of the boiler before operating. Always exercise caution when transporting.
Instructions provided are only general guides, and are not substitute for common sense and sound
safe practices.
Warning:
Do not use this boiler if any part has been under water. Immediately
call a qualified service technician to inspect the boiler and to replace
any part of the control system and any gas control which has been
under water.
D-VAC Sales Inc. Email: [email protected] Tel: (516) 256-3131 www.dvachvac.com