
H2fl ow Controls
ProcessDefender™
17
Programming
H2fl ow Controls
ProcessDefender™
16
Programming
5.3 Menu 2 - General Confi guration
Fig.1.7
Aft er entering the menu structure, press the
button to proceed to the General
Confi guration menu (2.0.0). While most applications will not require anywhere
near all PD100 parameters to be programmed, the following are required for
all
applications.
Important Note:
If you are programming the PD100 for the fi rst time, the transition
from one sub menu to another will take place automatically when you accept the value of
the current one, i.e., if you are programming 2.3.1 and press enter to accept your change,
the PD100 will take you directly to 2.4.1.
Scan the above QR Code
to watch an instructional
video about Menu 2.
Menu Number
Description of Value to be Entered
2.1.1
Parameter Lock / Unlock
2.2.1
Unit of Measurement for displayed motor power - HP or kW
2.2.2
Motor size (HP or kW depending on what was set in 2.2.1)
2.3.1
Motor start delay (the time that it will take for the motor to reach full speed
and to pick up the normal process load)
2.4.1
Current Transformer Size (Amps)
2.5.1
Number of passes of wire through the CT
2.6.1
Number of supply phases to motor (1 or 3)
2.6.2
Number of CT’s installed (PD100 = 1)
2.7.1
Fixed display of measured motor power
2.7.2
Auto-scrolling of measured values
2.8.1
Motor Supply Voltage