gaitway-3D Service manual
Ref.:TM-MAN-0005-ARS
Iss.: A
Rev.: 9
Date: 07/12/2020
Page : 84
16. Load cell replacement checklist
16.1. Load cell dismounting
Date:
Name:
Time:
Test Step
Measurements/Test Results
Seq.
No.
Description
Required/No
minal (incl.
tolerance)
Measured/
Calculated
Remarks/Calculations
Pass/
No
pass
1.
Test Readiness Review:
Check
implementation
of
safety
precautions
Identify item name, identification number
and serial number.
Device name, type:
Device s/n:
Instrumentation s/n:
2.
Indicate the load cell that needs to be
replaced.
Load cell:
1, 2, 3 or 4
Load cell:
3.
Switch off gaitway-3D system and
disconnect mains plug.