GymPark GB112B1 Скачать руководство пользователя страница 5

Placing and Adjusting 
the equipment

After having prepared the foundation of the main pole it is time to prepare 
the foundation of the instruments.

In order to better stabilize the equipment you will have to create separate 
concrete  bases  for  every  instrument.  The  procedure  takes  place  the 
same day with the installation of the main pole. 

The exact distances of the additional instrument holes can be seen from 
the graphics in the following pages. Each hole needs to be approximately 
30cm  wide  x  30  cm  length  x  30cm  deep  and  should  be  filled  with 
concrete.  

After the concrete has stabilized you need to drill and screw (if required) 
the instrument on the bases you’ve created using the special expanding 
screws supplied along with the equipment. Alternatively you can also use 
aftermarket mechanical plugs. 

Please note that drilling for stability purposes is required for some 
and NOT ALL the instruments. 

Concrete bases are used to ensure the stability of the instrument in 
a gravel or soil surface.

Expanding screws supplied 
with the equipment

Aftermarket mechanical plugs

Содержание GB112B1

Страница 1: ...Users manual on how to Install and set up a GymPark outdoor fitness equipment...

Страница 2: ...anchor is then placed in the middle of the hole Anchor 70cm 50cm 60cm Please note that the size of the hole depends on the consistency of the ground If the ground has debris or is extremely soft the h...

Страница 3: ...th concrete until it reaches ground level Make sure that you use ready made C20 25 concrete For filling up the foundation of all the holes you would require approximately 1 5m Make sure that the equip...

Страница 4: ...ave approximately 16 to 40 hours depending on the climatic conditions for the concrete to fully strengthen before attempting to place the main pole Prior to installing the main pole completely remove...

Страница 5: ...owing pages Each hole needs to be approximately 30cm wide x 30 cm length x 30cm deep and should be filled with concrete After the concrete has stabilized you need to drill and screw if required the in...

Страница 6: ...e bicycle and surf equipment you will have to create concrete surfaces in the areas shown with Number of concrete surfaces Bicycle 4 2 front 2 rear Surf 1 Bicycle Only 2 holes drilled in the front one...

Страница 7: ...e Pull and Push Chair GP111B3 GB112B3 For installing the pull and push equipment you will have to create concrete surfaces in the areas shown with Number of concrete surfaces Push 1 Pull 1 No need to...

Страница 8: ...Stepper and Leg Stretcher GP110B3 GB113B1 For installing the stepper and leg stretcher equipment you will have to create concrete surfaces in the areas shown with Number of concrete surfaces Stepper...

Страница 9: ...Rider GP113B3 GB112B1 For installing the Rambler and Bonny Rider equipment you will have to create concrete surfaces in the areas shown with Number of concrete surfaces Bonny Rider 1 Three holes Rambl...

Страница 10: ...ying Curve GP 110B2 GP113B2 For installing the Parallel Bars and Lying Curve equipment you will have to create concrete surfaces in the areas shown with Number of concrete surfaces Parallel Bars 1 Lyi...

Страница 11: ...Safety Distances In order to enable the athletes easier access as well as training to the equipment please follow the below minimum safety distances...

Страница 12: ...on an individual sign placed in the entrance of the park This manual describes the installation process and is to be used as a general guidance tool The type of ground considered in the directions il...

Отзывы: