NM101D - Page 3
3.
r
eplAceMeNt
of
the
wooDeN
B
AtteN
:
4.
r
eplAceMeNt
of
the
pAir
of
s
priNGs
:
5.
r
eplAceMeNt
of
the
wooDeN
h
iNGe
:
No. 6 Allen Key
17’
19
20
15
18
15
18
1’
1’
1’
1’
21’
1’
12’
12’
12’
13’
12’
12’
22
15
16
14
15
16
21’
1 tube spanner no. 13
1 tube spanner no. 13
1 tube spanner no. 13
1 open end spanner no. 13
1 open end spanner
no. 13
1 open end spanner
no. 13
p
lAce
oNe
poiNt
of
threAD
BrAKe
At
the
eND
of
eAch
screw
Before
tiGhteNiNG
p
lAce
oNe
poiNt
of
threAD
BrAKe
At
the
eND
of
eAch
screw
Before
tiGhteNiNG
p
lAce
oNe
poiNt
of
threAD
BrAKe
At
the
eND
of
eAch
screw
Before
tiGhteNiNG
Strong thread
brake
Strong Thread brake
Strong thread
brake
l
iGhtly
GreAse
the
ceNtrAl
Groove
Grease