01/02/22
0014C
CS 30056 - 45 RUE G. DE FLOTTE
13375 MARSEILLE CEDEX 12 (F
RAnCE
)
TEL : 33.(0).4.91.87.51.20 FAX : 33.(0).4.91.93.86.89
www
.
GyMnOvA
.
COM
NM101D-GB
K
eep
this
D
ocuMeN
t
A
sseMBly
i
NstructioNs
for
M
AiNteNANce
Constantly aiming to improve our products, we reserve the right to make changes to the equipment and dimensions without further discussion.
B
eGiNNers
s
oft
s
priNGBoArD
- 24
cM
Warning:
This equipment should be installed by a qualified individual. This equipment should only be used by one person at a time, under the
supervision of a qualified individual.
Using this equipment for purposes other than those originally intended is prohibited.
Recommendations:
- Keep these instructions for subsequent reference (inspection, maintenance, etc.).
- Periodically carry out predictive maintenance.
- Depending on how much it is used have the equipment serviced yearly or every few years.
Pack list and bulkiness of the springboard:
- 1 Pack (Ref. 0014C) - Weight : 24Kg - Dim.: 1.33 x 0,62 x 0,27m - Vol. : 0,22 m3
Tools required:
I. General maintenance:
i
MportANt
:
Regular cleaning of the apparatus makes it easier to spot any problems (distortion, breakage or moisture absorption).
Before each use, make a through check on good condition and correct operation of wear parts and safety elements:
- Check the condition of pads
(10’)
and wheels
(2)
,
(6)
or
(24)
.
- Check the condition of springs
(17’)
, wooden tray
(12’)
, wooden batten
(13’)
and wooden hinge
(21’)
.
- Check the tightening of all fixings
(4), (5), (8), (9), (11), (14), (18), (19)
and
(22)
.
- If a problem is detected or suspected, do not use the equipment as long as it has not been checked by a technician.
- Any damaged or distorted component should be replaced as quickly as possible.
- 1 open end spanner no 13
- 1 open end spanner no 10
- 1 tube spanner no. 13
- 1 tube spanner no. 10
- No. 6
Allen Key
- Plastic mesh
- Phillips
screwdriver
Side view
Top view