GWI G4 SEI V2 Скачать руководство пользователя страница 1

George Wilson Industries Limited

Aldermans Green Industrial Estate
Barlow Road
Coventry
CV2 2LD
United Kingdom

www.gwi-ltd.co.uk

G4 SEI V2  
User Reference Guide

FS 00657

EMS 86012

IS 588650

OHS 638127

For the installer:

Registration with the communications hub

1. Press button A to enter the main menu
2. Navigate to the 01 - Install window
3. Press and hold button B to initiate commissioning

The meter will display the remaining time in minutes and
the commissioning progress bar:

60 minutes are allocated to allow connections to be made and 
to fully commission the meter. There are 4 stages to the process, 
represented by the four progress symbols after the colon. In the 
example the 1st and 2nd stages have been completed.

The first stage is the communications module successfully 
paired with hub (8.11), with the three further stages as per 
GBCS. Once successfully commissioned the meter will 
automatically quit service mode. The process can be 
prolonged for an additional 60 minutes by re-selecting the 
01 - Install window and then press and hold button B.

The installer can navigate to the 19 - Quit Service Mode window 
to exit installation/service mode. The meter will continue the 
commissioning process in the background until it is complete, 
however this will disable all service accessible windows.

After quitting service mode / successful commissioning, 

access to the service menu is unobtainable unless the 

security seals and compartment cover are removed.

This gas meter is approved to the Gas Act 1986: Section (17): 
Gas Meters and Regulations 1983

It is compliant with the requirements of
•  BS EN 1359: 1999/A1 (2006) and BS EN 16314:2013
•  MID Directive (2004/22/EC)
•  EMC Emissions EN 16314:2013* Section 4.12 &  
   ETSI EN 301489-17 v3.1.1 (ETSI EN 301 489-1 v2.1.1)
•  EMC Immunity EN 16314:2013* Section 4.12 &  
   ETSI EN 301 489-17 v3.1.1 (ETSI EN 301 489-1 v2.1.1) 
•  Directive for Potentially Explosive Atmospheres Directive 
   (ATEX) 2014/34/EU 
•  Council Recommendation (1999/519/EC) of 12 July 1999  
   on the limitation of exposure of the general public to  
   electromagnetic fields (0 Hz to 300 GHz) 

Gas meters must be installed by a Gas Safe registered installer in 
accordance with BS 6400.

All warning & safety labels must remain attached to the meter 
and be adhered to at all times.

The meter secure perimeter must be inspected for any 

tamper attempts at the end of the installation and during 

any subsequent meter visit. 
All enquiries regarding installation, servicing and 

maintenance of this gas meter must be directed to 

your energy provider.

Declaration of Conformity

Access Levels

The index has 3 access levels which enable different windows 
to authorised users (see list of windows in main booklet):
(A) Always - Screen always visible
(U) User - Screen visible after correct PIN entered 
 

 

(or PIN disabled)

(S) Service - Screen visible in service access mode

Communications Module Triggering

If the communications module needs waking up, navigate to 
this window (03) in the main menu and activate it (press and 
hold button B). If the ZigBee is already in an awake state the 
action will be ignored.

ISMS Classification: Public

Version 1.0 04.MAY.2020 

ENG09040

ISO 22301

Отзывы: