background image

 

9

10

 

3  PoE Web Management Page

 3.1 Preparation Work

 

 3.2 Set Up Network Connection

 

 

3.2.1 Set Stastic IP Address of Managed PC

 

This

 

product

 

has  Web  management  function  which  allows  users  to  control  and 

manage PoE of each port by logging in on Web page.

(1)  You  need  to  set  the  management  PC    and  this  injector  IP  address  under 

the  same  network  segment,  this  product’s  default  IP  address  is 

192.168.1.200, gate is 255.255.255.0;

(2) If you need to connect remote network, please make sure the management 

PC and the router can make this;

(3)This product can

'

t assign the IP address for the management PC, you need 

to set the management static IP by yourself.

Operation

 

steps (take Windows

 

XP

 

as

 

sample

):

(1)  Click  <start>  to  enter  the  [start] 

menu,  select  “control  panel”.  Double 

click  “network  connection”  icon,   

double  click  the  “local  connection” 

icon, pop out “local connection  status” 

window. 

Make

 

sure

 

the

 

management

 

PC has

 

already been

 

installed with Ethernet

 

adapter;

Use

 

network

 

cable

 

to

 

connect

 

the

 

console

 

port

 

with

 

management

 

PC.

Instruction

 

 

 

 

(2) Click

 <

property

>

 button

,

 enter

 "

local

 

connection

 

property

window.

(3) Select

 "

Internet

 

protocol 

(

TCP/IP), click 

<property> button, enter “Internet protocol 

(TCP/IP) property” window.  Select “use 

the IP address below” button, input IP 

address( use arbitrary value between 

192.168.1.1~192.168.1.254, besides 

192.168.1.200) and the subnet 

mask(255.255.255.0). Click

"

OK

"

 to finish 

the configuration. 

DNS

 

server

 

address

 

can

 

be

 

empty

 

or

 

be filled in with the

 

real

 

server

 

address

.

Instruction

Содержание GWSW1602G

Страница 1: ...16 24 Ports PoE switch User Manual...

Страница 2: ...1 1 2 Board Diagram 1 3 Specification 2 1 4 Product Feature 3 2 Installation 4 2 1 Shipping List 4 2 2 Installation Precautions 4 2 3 Installation Way 6 2 3 1 Rack Installation 6 2 3 2 Workbench Insta...

Страница 3: ...oE Web Management Port PoE Output LED Reset PoE Output Percentage LED PoE Output Ports Reset PoE Web Management Port PoE Output LED Uplink Gigabit Ports PoE Output Percentage LED 24 Ports PoE switch A...

Страница 4: ...Terminal 1 Grounding Terminal PoE Power Power Input Mains on load 100 240VAC 50 60Hz PoE Power Supply End span 1 2 3 6 IEEE802 3 af at PoE Max Power Output 250W 370W 340W if 110V AC input Single Port...

Страница 5: ...h may be affected by external interference outside the system through the ways of radiation and conduction Please pay attention to the followings AC power supply is TN system so it is necessary to use...

Страница 6: ...ort switch when install the switch to the rack 2 3 2 Workbench Installation You can put this product on clean stable grounded workbench The installation procedure is as below 1 Put the device upside d...

Страница 7: ...urself Operation steps take Windows XP as sample 1 Click start to enter the start menu select control panel Double click network connection icon double click the local connection icon pop out local co...

Страница 8: ...rnet option enter Internet option window 3 3 Operating Guidance of Web 3 3 1 Start and Login This product web default IP address 192 168 1 200 subnet mask 255 255 255 0 administrator account admin pas...

Страница 9: ...and wait for 10 seconds till product IP address is successfully changed 13 14 After inputting the correct user name and password click Login and the browser will show the product Web management page a...

Страница 10: ...at the computer IP address and the product IP address must be in the same network segment and the settings of subnet mask and gateway must be correct 2 When changing product IP address please ensure t...

Страница 11: ...power to be contributed decreases and the number of PoE equipments to be connected decreases on the contrary the more the number of PoE equipments to be connected the higher risk of system overload 4...

Страница 12: ...port and popup dialog box Take port 1 as an example press OK popup setup is successful When setting succeeds corresponding button becomes 1 Actual output total actual output power 2 Surplus the power...

Страница 13: ...meters press OK button of the corresponding port then popup setting success when operation finishes Setting all the port parameters press port control and status actual output power W button then popu...

Отзывы: