9
3. Connect your appliance to gas cock from the shortest way and in a manner to
prevent any leakage. For safety, the hose used should be maximum 125 cm and
minimum 40 cm.
4. While making gas leakage control; never use lighter, match, glowing cigarette or
similar inflammable matter.
5. Apply soap bubble on connection point. If any leak/leakage exists, foaming will
occur on soaped region.
6. If the cooktop is to be mounted on a cabinet or openable drawer, a heat protection
panel having 15 mm minimum opening should be mounted under the cooktop.
IF BUILT-IN OVEN IS PLACED UNDER COOKTOP
Figure 1
Cooktop
Hose
Oven
Gas pipe should be affixed in a way not to touch the oven below, sharp edges and
corners, not to be pulled in a manner to be twisted and strained. Make gas connection
from right part of the cooktop, fasten the hose by use of clamp.
INSTALLATION OF COOKSTOP
1. Detach the burners, burner hoods and grills from the product.
2. Turn the cooktop down and place on smooth ground.
3. In order to prevent entrance of foreign substances and liquids between cooktop
and counter, apply the paste given in package to the sides of lower guard of
counter. For corners, curl paste and increase curls till filling corner gaps.
4. Turn cooktop again and align with and place on counter.
5. Fasten up your cooktop on counter by using the clamp and screws supplied.
On the assembly chart given in next page, it is shown how to assemble your
cooktop.