
11
1. Ensure power is disconnected to all cables and devices
before installing the Base Unit.
2. If bringing cables into the Base Unit through the rear, thread
cables through the appropriate knock-out holes before
attaching the unit to the wall.
3. Use the drilling template printed on the packaging to mark
the holes on the wall where you intend to mount the Base
Unit.
4. Use suitable anchors for the wall type (not included) at the
four mounting locations indicated on the hole template.
5. Fasten the Base Unit to the wall using the appropriate screws
(not included). Screws must be fitted to all 4 mounting points.
Attaching the Base Unit
to the wall
Содержание GU-HB-201-R1
Страница 1: ...GURU Hub Base Unit V1 Installation Guide GU HB 201 R1 ...
Страница 19: ......
Страница 20: ... 2013 Guru Home Systems Ltd 10 Stoney St London SE1 9AD UK ...