29
General information
28
Component part and accessories
1. Main unit – GJPASRW-08P/12P/15P/20P/30P
2. Installation accessories
•
Installation instructions
•
Union couplings
•
Damping rubber blocks
•
Drainage pipe
•
Winter cover
Important information
Especially important points concerning transport and
storage, installation, usage, maintenance and fault tracing are
presented below.
Transport and storage
Models designed to be transported vertically must be
transported in this way. This is because the suspension inside
the compressor can be damaged if the unit is laid down. If
the heat pump is tilted during installation or draining this
should be done with care and for the shortest time possible.
The original packaging is intended to be used to reduce the
risk of transport damage.
Remove the packaging and before installation check that the
heat pump has not been damaged during transport. Report
any transport damage to the forwarding agent.
Installation
The pool heat pump must be installed by a qualified
installation engineer and placed outdoors. The unit must
stand firmly, straight and raised from ground level. Provide a
firm and flat surface, for example, garden slabs, concrete bed,
Leca blocks or similar.
Noise propagation must be taken into consideration when
positioning during installation. Positioning of the unit must
be done so that noise from the compressor and fan disturb
the environment as little as possible.
Large amounts of melt and condensation water can be
discharged during defrosting and operation. Consequently, it
is important to provide good drainage and run-off.
The units must stand freely so that air is not prevented to
pass the evaporator. Avoid a placement that produces cold
air circulation as this reduces the output of the heat pump.
Use and operation
The parameters on the display are set at the factory and do
not need to be adjusted. The temperature is set to 27 °C. If
you wish to increase the temperature, check first to ensure
that your wishes of a high temperature do not contravene
any guarantees concerning the general pool construction.
Maintenance procedures
It is important to drain the water from the pool heat
pump before the winter. The material guarantee does not
cover damage due to freezing on account of insufficient
maintenance. The heat exchanger can also be flushed out to
remove any remaining deposits ahead of winter drainage.
Read more about drainage in section 4 - Maintenance, service
and fault tracing.
Perform regular checks to ensure that the inlet grille is not
blocked by leaves, snow, etc. In addition, make sure that
excessive frost or ice does not build up below the unit during
cold weather conditions.
The outer case can be cleaned using a damp cloth if
necessary. Take care not to scratch the unit.
Service and support
GJPASRW-08P/12P are designed for reliable operation and a
long life. If a fault should occur you should always contact the
installation engineer who carried out the installation. If the
installation engineer in turn considers it to be a question of
a material or manufacturing fault, he/she will contact us for
inspection and action to rectify the problem. Always state the
product’s manufacturing number. The number can be found
on the rating plate below the LED display. A basic guide to
fault tracing is presented in section 4 - Maintenance, service
and fault tracing.
Installation material is enclosed inside the
machine. Open the cover and remove the
material before installation. Note that the
installation engineer provides pipes and
the bypass coupling for the installation.
!