![Gulfstream G550 Скачать руководство пользователя страница 76](http://html1.mh-extra.com/html/gulfstream/g550/g550_operating-manual_2278719076.webp)
are activated
Prior to the first flight of the day, a complete check of the automatic ground
spoiler system is usually conducted using the test switch and other controls
to verify the operation of the system activation logic. See the Before
Takeoff: 03-04-00 section of this manual for a complete description of the
entire test.
3. Controls and Indications:
(See Figure 21 and Figure 22.)
NOTE:
Since the spoiler panels on the upper wing surfaces
are not visible from the cockpit inflight, the position of
the spoilers is monitored using the Flight Controls 2/3
synoptic page. A full description of the Flight Controls
2/3 synoptic page appears in section 2B-07-00.
A. Circuit Breakers (CBs):
The following CBs protect the spoiler system:
Circuit Breaker Name:
CB Panel:
Location:
Power Source:
SPDBRK ALARM
REER
A-26
Right Essential DC Bus
SPLR FLT PWR S/O
CPOP
E-3
Right Essential DC Bus
GND SPLR
CPOP
E-2
Right Essential DC Bus
LEFT WOW
POP
C-1
Left Essential DC Bus
RIGHT WOW
CPOP
C-1
Right Essential DC Bus
WHEEL SPEED
POP
C-3
Left Essential DC Bus
THROT QUAD
CPOP
C-2
Right Main DC Bus
B. Crew Alerting System (CAS) Messages:
The following CAS messages indicate the status of the speed brake /
ground spoiler system:
Area Monitored:
CAS Message:
Message Color:
MAUs #1 and #2, Speed Brake
handle, spoiler panel RVDTs /
stowed contact switches
Aircraft Configuration
Red
MAUs #1 and #2, ground spoiler
arming logic circuit, stowed
contact switches
Ground Spoiler
Red
Spoiler Control pushbutton,
spoiler control valves
Spoilers Hydraulic Off
Amber
MAU #2, Speed Brake handle
switch and power lever position
Speed Brake Extended
Amber
Left main landing gear downlock,
GND SPLR ARMED pushbutton
Ground Spoiler Unarm
Blue
MAUs #1 and #2, pressure
reducing module
Single Speed Brake
Blue
Speed Brake handle switch
Speed Brake Extended
Blue
OPERATING MANUAL
PRODUCTION AIRCRAFT SYSTEMS
2A-27-00
Page 76
August 14/03
Title Page
Prev Page
Next Page
TOC
Содержание G550
Страница 6: ...Title Page Prev Page Next Page TOC ...
Страница 16: ...Title Page Prev Page Next Page TOC ...
Страница 18: ...Title Page Prev Page Next Page TOC ...
Страница 20: ...Title Page Prev Page Next Page TOC ...
Страница 32: ...Title Page Prev Page Next Page TOC ...
Страница 44: ...Title Page Prev Page Next Page TOC ...
Страница 46: ...Title Page Prev Page Next Page TOC ...
Страница 54: ...Title Page Prev Page Next Page TOC ...
Страница 58: ...Title Page Prev Page Next Page TOC ...
Страница 59: ...Flap Handle Figure 16 OPERATING MANUAL 2A 27 00 Page 59 60 August 14 03 Title Page Prev Page Next Page TOC ...
Страница 60: ...Title Page Prev Page Next Page TOC ...
Страница 68: ...Title Page Prev Page Next Page TOC ...
Страница 80: ...Title Page Prev Page Next Page TOC ...
Страница 82: ...Title Page Prev Page Next Page TOC ...
Страница 84: ...Title Page Prev Page Next Page TOC ...
Страница 86: ...Title Page Prev Page Next Page TOC ...
Страница 88: ...Title Page Prev Page Next Page TOC ...
Страница 90: ...Title Page Prev Page Next Page TOC ...