
Yoke cover
5. Yoke & Downrod Assembly
Fan assembly
Canopy
Downrod Set Screw
Cross Pin
Yoke
Downrod
Cotter Pin
Blade holder
Blade
Mounting Bracket
Canopy
1.Unpack and inspect fan carefully to be certain all contents are
included.
Yoke
Cotter Pin
Cross Pin
Downrod
Wires
Yoke cover
OFF OFF OFF
Turn off power at breaker
box to avoid possible
electrical shock.
Use metal outlet box suitable for
fan support.
Secure outlet box directly to the
building structure using wood
screws (included).
Outlet box must support 40 lbs
min.
Install mounting bracket
to Outlet box in ceiling
using washers and the
mounting screws
provided with the outlet
box.
2.
3.
4.
Do not use existing
mounting bracket,
replace it with new
mounting bracket from
box.
Do not use existing
mounting bracket,
replace it with new
mounting bracket from
box.
Outlet Box
Mounting
Bracket
(2)
Insert the cross pin through yoke & downrod
and secure with cotter pin.
(3)
Tighten both downrod set screws to further
secure downrod, then pull down the yoke
cover to cover yoke.
P2
Mounting Screw
2pcs
Spring Washer
2pcs
Lock Washer
2pcs
Mood Screw
2pcs
Tooth Washer
2pcs
Blade Balance Kits
1pcs
Blade Screw
13pcs
Paper Washer
13pcs
Wire nuts
3pcs
Pull Chain Knob
1pcs
Motor screw
9pcs
Hardware bag
Hardware bag
Switch Housing Cover
(1)
Take cotter pin and cross pin off
downrod assembly.
downrod
(2)
Feed motor lead wires through yoke cover ,
canopy,
and insert downrod into yoke.
Downrod