3.  OPERATING INSTRUCTIONS 

3.1.

 

INSTALLATION 

The model 6636 has been shipped with the line input voltage set to 240 V with the fuse removed 
unless specifically requested to be set to another voltage level. The line input selectors must be 
set  to  the  correct  line  voltage  before  power  is  applied  to  the  instrument.    Remove  the  warning 
label  positioned  across  the  power  cord  only  after  checking  the  setting  of  the  operating voltage.  
The line input voltage selection must be set correctly.  The settings available are 100 V, 120 V, 
220 V, and 240 V.  Figure 3-1 details the line input voltage selector setting. 

The instrument is supplied with a North American style line cord, unless otherwise specified at 
time of order.  Ensure that the line cord is plugged into a wall socket or extension cord that has a 
protective or safety ground.  Where 3-contact power supply outputs are not available, a suitable 
protective  ground  connection  must  be  made  before  switching  the  instrument  power  on.    Any 
interruption of the protective ground may possibly render the instrument unsafe. 

To set the correct line input voltage pry open the power receptacle on the rear panel as shown in 
Figure 3-1. 

Place  the  instrument  on  a  vibration-free  bench  or  install  it  in  an  equipment  rack  as  required.    
Connect the line cord to the appropriate line power outlet and switch the instrument on using the 
power switch at the back of the instrument at the line input connect. 

The red POWER lamp should light, together with the green HEATER lamp. 

When the inner chamber containing the standard resistors reaches its operating temperature, the 
HEATER  lamp  will  indicate  periodic  cycling.    Due  to  the  thermal  lagging,  it  will  take  several 
hours  to  raise  the  inner  chamber  and  the  standard  resistors  to  the  operating  temperature.    The 
standard resistors should be allowed to stabilize at the operating temperature for at least 36 hours 
before measurement or use. 

 

3.2.

 

OPERATING NOTES 

3.2.1.

 

Connection to Standard Resistors 

Connection  to  the  resistor  terminals  should  be  made  with  coaxial  shielded  cables.    The 
certified  resistance  of  each  resistance  element  installed  and  the  date  of  calibration  are 
indicated in the ISO/IEC Calibration Certificate 

3.2.2.

 

Monitoring of the Internal Temperature 

The  PRT  which  comes  to  the  front  panel  is  used  to  measure  the  internal  temperature.  
Connect  an  ohmmeter  capable  of  four  wire  resistance  measurement  with  low  excitation 
current.  Connect the current leads to C1 and C2, and the respective potential leads to P1 

Содержание 6636

Страница 1: ...to Guildline Instruments Limited They are to be used only as a guide to the operation and maintenance of the equipment with which this manual was issued and may not be duplicated or transmitted by an...

Страница 2: ......

Страница 3: ...line cord supplied or a proper line cord specified for the country of use Operating this instrument without a proper grounded line connection can result in electrical shock hazard 4 Observe all conne...

Страница 4: ......

Страница 5: ...ine Input Connector 1 3 1 4 2 Resistor Terminals 1 3 1 4 3 Guard Terminal 1 3 1 4 4 Chassis Ground Terminal 1 3 2 SPECIFICATIONS 2 1 2 1 GENERAL SPECIFICATIONS 2 1 2 2 RESISTANCE SPECIFICATION 2 2 3 O...

Страница 6: ...iminary Checks 4 1 4 3 2 Temperature Control 4 2 4 3 3 Over Temperature 4 4 5 PRINCIPLES OF OPERATION 5 1 5 1 INTRODUCTION 5 1 5 2 TEMPERATURE SENSITIVE OSCILLATOR 5 2 5 3 AMPLIFIER AND DETECTOR 5 2 5...

Страница 7: ...OF FIGURES FIGURE 1 1 FRONT VIEW 1 2 FIGURE 1 2 REAR VIEW 1 3 FIGURE 5 1 HEATER CONTROL UNIT 5 1 FIGURE 5 2 TEMPERATURE SENSITIVE OSCILLATOR 5 2 FIGURE 5 3 AMPLIFIER AND DETECTOR 5 2 FIGURE 5 4 HEATER...

Страница 8: ...OM6636 B 00 12 February 2015 iv LIST OF TABLES TABLE 2 1 GENERAL SPECIFICATIONS 2 1 TABLE 2 2 RESISTANCE SPECIFICATION 2 2 TABLE 4 1 CONTROL CIRCUIT BOARD TESTING 4 2 TABLE 4 2 TRANSISTOR VOLTAGES 4 4...

Страница 9: ...l shock and vibration in commercial carrier shipment To protect the standard resistors from overheating due to a malfunction of the temperature control there is an overriding over temperature control...

Страница 10: ...excess of the operating temperature or in the event of control failure 1 3 4 PRT The platinum resistance thermometer imbedded within the temperature controlled chamber is configured as a four termina...

Страница 11: ...esistor Terminals There are a set of two terminal input outputs for each installed resistance element Each set consists of two type N connectors labelled with the nominal value of each of the standard...

Страница 12: ...Section 1 OM6636 B 00 12 February 2015 1 4...

Страница 13: ...resistors 28 0 003 C 82 4 0 005 F Temperature Stability 1 year exclusive of the self heating effects of the resistors 28 0 01 C 82 4 0 02 F Cold Power on Stabilization Time to Specified Accuracy 36 ho...

Страница 14: ...0 10 T 3500 3000 750 25 1000 100 T 6000 5000 1000 35 1000 Table 2 2 Resistance Specification Notes 1 Nominal initial tolerance is defined as the maximum variation of resistance mean values as initiall...

Страница 15: ...on the rear panel as shown in Figure 3 1 Place the instrument on a vibration free bench or install it in an equipment rack as required Connect the line cord to the appropriate line power outlet and sw...

Страница 16: ...the following equation C R R t t 392 0 0 Where R0 is the previously measured resistance value 3 2 3 Power Entry Selection Check to see that the fuses inserted in the receptacle correspond to the corr...

Страница 17: ...r if the resistors temperature stabilized enclosure has been allowed to cool the resistors should be allowed to stabilize at the operating temperature for at least 36 hours before measurement or befor...

Страница 18: ...rcuit If the indicator lights then check the resistance of Rl and the thermistor pair RT1 RT2 Rl should be 3 k to 5 k RT1 RT2 is equal to Rl at 30 C and is larger than R1 if the temperature is less th...

Страница 19: ...4 T101 C102 R103 R125 R104 R110 TP1 If oscillation is observed then check between TP2 collector Q103 and Pl 7 The waveform should be as shown If not then check the following components Q103 C106 R117...

Страница 20: ...mperature sensitive switch S2 is open If these conditions are satisfied then replace fuse F1 and check that the HEATER indicator is lit Monitor the increase in temperature with the PRT If the lamp doe...

Страница 21: ...re consists of the following functional blocks a Temperature Control consisting of a sensor oscillator amplifier detector and heater b Over temperature Circuit c Power Supply Figure 5 1 HEATER CONTROL...

Страница 22: ...utput to the base of Q101 increases As soon as this voltage exceeds half the transformer output the circuit gain becomes greater than one and oscillation occurs 5 3 AMPLIFIER AND DETECTOR Figure 5 3 A...

Страница 23: ...ols the heater current The resistors R119 R121 and R122 ensure that Q1 is not conducting when there is no output from the oscillator 5 5 OVERTEMPERATURE CIRCUIT If the temperature in the enclosure exc...

Страница 24: ...of the instrument from 100 120 VAC or 220 240 VAC 50 or 60 Hz and feeds a full wave rectifier The heater is fed from the unregulated output and the control circuit is fed from a regulator consisting...