Installation and commissioning
Generator installation for iMAPLA 8, 13, 17 and 20
5.5.6
Assembly instructions for flange mount SAE5
Preparatory disassembly
Ö
Fig. 27, Preparatory disassembly of the flange mount
>
Unscrew two M8 x 45 screws
[2]
, wrench size 10 mm.
>
Remove the collar
[1]
.
>
Unscrew and remove four screws M12 x 12
[3]
, along with the washers.
1
2
3
(4x)
Fig. 27 Preparatory disassembly of the flange mount
(iMAPLA 8 and 13)
Assembly
Ö
Assembly of flange mount SAE5 (
MAPLA 8,13,17 and 20), page 77
>
Place the flange
[2]
onto the generator and secure with four screws
[4a]
.
Apply Loctite to the screw thread and place a toothed washer
[4b]
underneath the screw head.
>
Place the collar
[2]
and clamp securely with two screws.
>
Mount the coupling plate
[5]
on the shaft at the generator and prevent it
from twisting on the shaft with a key.