background image

15

Gate in the

CLOSED POSITION

Pinch Area

Gate in the
OPENED POSITION

Pinch Area

2" minimum

2" minimum

Be sure gate opener 

and bracket don't bind.

Step 6 

When you feel that you have the best position for the post pivot bracket in the open position, insert the 5/16" x 1-3/4" bolt 
through the aligned holes of the post bracket and post pivot bracket to hold it in place. Remove the clevis pin from the front 
mount and while supporting the gate operator, swing the gate and gate operator to the closed position. With the gate and gate 
operator in the closed position check the clearance and be sure that the gate operator is not binding at the post pivot bracket.

If you don't have 2 inches of clearance or the gate operator is binding on the post pivot bracket, remove the 5/16" x 1-3/4" 
bolt and readjust the pivot bracket until you can achieve these important clearances.

With the post pivot bracket in the optimum position for clearance and freedom of movement, reattach the operator to the gate 
bracket in the open position and recheck the gate operator level and make sure the brackets are clamped securely.

IMPORTANT

:

 

While determining the mounting point for the post pivot bracket assembly, be sure that the position allows 

for minimum 2 inches of clearance between the gate and the operator in both the open and closed positions, as shown in the 
diagrams below. This clearance will give the operator the most efficient leverage point for opening and closing the gate and 
more importantly provides the least possible pinch area.

TIP:

 

Turning the pivot bracket over gives 

more hole alignment options for the post 

pivot bracket assembly. You can also move 

the entire post pivot bracket assembly to 

different positions on the gate post to help 

achieve the proper clearances.

Содержание /PRO SW-300

Страница 1: ...eleasing GTO Inc from any and all liability If you are not in agreement with this disclaimer or do not feel capable of properly following all installation and safety instructions you may return this p...

Страница 2: ...access locations not servicing the general public in which unauthorized access is prevented via supervision by security personnel The GTO PRO 3000 3200 Gate Operators are intended for use with vehicu...

Страница 3: ...page 17 Installation of the Closed Position Stops page 18 Mounting the Control Box page 20 Connecting the Operator Power Cables page 21 Powering the System page 22 Solar Chart page 22 Connecting the T...

Страница 4: ...ocks and other access control products These optional accessories see the enclosed GTO PRO Accessory Catalog are available The GTO PRO 3000 3200 Operators feature adjustable obstruction sensing This s...

Страница 5: ...and warnings in this manual are identi ed with this warning symbol The symbol identi es conditions that can result in damage to the operator or its components serious injury or death Because GTO auto...

Страница 6: ...size of gate its frequency of use and the proper class rating 2 Make sure the dual gate has been properly installed and swings freely in both directions Repair or replace all worn or damaged gate hard...

Страница 7: ...3 Devices such as contact sensors safety edges and non contact sensors photo beams provide additional protection against entrapment 4 If push buttons or key switches are installed they should be withi...

Страница 8: ...pray to it at least once per month 7 Service the gate and gate operator regularly Grease hinges spray push pull tube with high quality silicon spray and replace the battery every 3 5 years 8 To operat...

Страница 9: ...s one that transmits radio frequency RF signals to the gate operator for entrapment protection functions shall be located where the transmission of the signals are not obstructed or impeded by buildin...

Страница 10: ...tic gate operation and are required when installing the GTO PRO 3000 3200 Operators Furthermore a walk through gate must be installed if pedestrian traf c is expected near the vehicular gate We recomm...

Страница 11: ...ation and manual operation instruction label 1 installed on control box cover Logo and warning labels 2 installed on each side of operator housing 1 KEEP CLEAR Gate may move at any time 2 Do not allow...

Страница 12: ...ket 1 Post Pivot Bracket 1 Customer Support Card 1 Post Bracket 2 Closed Position Stop Plate 1 2 Receiver Mounting Screw 5 E Z GATE OPENER 3 8 Bushings 2 ON OFF Transformer 1 Battery 1 Control Box 1 W...

Страница 13: ...Gate Operator 1 w 40 Power Cable Gate Bracket 1 Post Pivot Bracket 1 Post Bracket 2 Closed Position Stop Plate 1 2 Mounting Screw 5 3 8 Bushings 2 Warning Signs 2 1 KEEP CLEAR Gate may move at any ti...

Страница 14: ...ntrol box See page 22 Powering the System and the Accessory Catalog for wire and solar charging panels If the gate is more than 1000 away from an AC power source you will need to use at least one GTO...

Страница 15: ...RF receiver tuned to 318 MHz Operator length with push pull tube fully retracted is 401 4 mounting point to mounting point Adjustable auto close timer OFF to 120 s and obstruction sensitivity Power te...

Страница 16: ...is an example of a pull to open installation on a chain link fence and dual gates Mounting the operators on a masonry column requires special procedures see Column Installation Information on page 39...

Страница 17: ...uare should be made of metal instead of wood so that it will remain stable while the operator is moving the gate On round posts of 6 diameter or larger the post pivot bracket may not be necessary for...

Страница 18: ...8 Lock Washer Post Bracket Assembly 3 8 Washer NOTE The following steps are intended for pull to open gate installations If you are mounting your operators on a push to open gate e g a gate on a slop...

Страница 19: ...lt and readjust the pivot bracket until you can achieve these important clearances With the post pivot bracket in the optimum position for clearance and freedom of movement reattach the operator to th...

Страница 20: ...upplied must be used Step 10 Mark reference points for bolt holes on the gate cross member through middle of gate bracket slots Drill 3 8 holes into the gate cross member as marked Mount gate bracket...

Страница 21: ...y Installing the Second Operator Step 12 Install the SLAVE operator on the remaining gate leaf by repeating Step 3 through Step 11 starting on page 14 After you have mounted the SLAVE operator proceed...

Страница 22: ...to as the SLAVE gate and gate operator Illustration A Closed Position Stop Plate mounted horizontally on metal post with U bolts SLAVE Gate Frame MASTER Gate Frame TOP VIEW FRONT VIEW Step 1 Attach th...

Страница 23: ...You must slide the closed position stop plate toward the ground stop until they touch Illustration C Once you have moved the stop plate to the correct position tighten its hardware completely NOTE Fo...

Страница 24: ...rminals on the RIGHT The extra vertical battery slot is for an optional second battery An optional second battery can be used for solar and or high traf c applications if needed Use mounting holes and...

Страница 25: ...into place Insert the stripped wires of the power cable into the appropriate terminals on the SLAVE OPERATOR terminal block The green wire should be inserted into the GRN terminal the blue wire into B...

Страница 26: ...you will plug the transformer Measure the distance from this outlet to the control box following the path where the wire will be laid After you have measured how much wire is needed cut the wire to th...

Страница 27: ...Step 5 Strip 3 16 off the ends of the low voltage wire and twist tightly Attach these ends to the 18VAC terminals located on the POWER IN terminal block see illustration at right Be certain not to le...

Страница 28: ...trol box to discourage insects from entering it and damaging the control board Step 6 Strip 1 2 of insulation from the ends of the low voltage wire Attach these stripped ends to the transformer termin...

Страница 29: ...Close With the Auto Close switch in the OFF position the gate will remain open until it receives another signal from an activation device such as a transmitter keypad or push button control With the...

Страница 30: ...en simultaneously SLAVE gate starts to close 8 seconds before MASTER gate 1 ON 2 3 4 DUAL MODES ON OFF 1 2 3 4 1 ON 2 3 4 DUAL MODES ON OFF 1 2 3 4 1 OFF 2 OFF 1 ON 2 OFF and 3 OFF 1 ON 2 OFF and 3 ON...

Страница 31: ...utton on the control board for 5 seconds Step 4 Press the transmitter button and allow the gates to return to the fully open position YOUR FIRST GATE S CLOSED POSITION LIMIT IS NOW PROGRAMMED Step 5 A...

Страница 32: ...tton and allow the gates to return to the fully open position BOTH YOUR MASTER AND SLAVE GATE S CLOSED POSITION LIMITS ARE NOW PROGRAMMED TESTING YOUR CLOSED LIMIT SETTING Press your entry transmitter...

Страница 33: ...this equipment Such modi cations could void the user s authority to operate the equipment Obstruction Sensitivity Potentiometer ALWAYS KEEP SAFETYAT THE TOP OF YOUR LIST WHEN ADJUSTING OR SERVICING Y...

Страница 34: ...ing safety device wiring to the terminal blocks Unplugging the transformer does not turn power to the operator OFF Contact Sensor Input Connection Connect one of the OPEN EDGE contact sensor wires to...

Страница 35: ...ion PLEASE NOTE Non contact sensors are not included with the GTO PRO 3000 3200 Wire from Non Contact Sensor photo beam STALL FORCE M I N M A X GRN BLK RED RECEIVER COM COM CYCLE CLOSE SAFETY EXIT OPE...

Страница 36: ...to the COMMON COM terminal and the other to the CYCLE CLOSE terminal on the GTO PRO 3000 3200 control board Each activation of the accessory will cause the gate to cycle as follows OPEN STOP CLOSE ST...

Страница 37: ...e gates are in the closed position 3 8 x 2 Bolt 3 8 Nut Push To Open Bracket optional accessory Post Bracket Post Bracket 3 8 Lock Washer Post Bracket Assembly 3 8 Washer Step 2 After verifying that y...

Страница 38: ...in the closed position 2 OPEN Limit setting Gates in the OPEN POSITION To achieve optimum open position you are required to complete the following SEVEN STEPS Step 1 Con rm that the power switch is in...

Страница 39: ...transmitter button when the second gate reaches the desired open position This step may be repeated until desired open position is achieved Once the desired OPEN position has been achieved proceed to...

Страница 40: ...broken or spliced wires Check the Red STATUS LED on the Control Board IF THE LED IS ON but the unit is not working 1 Check the battery in your transmitter and replace with a fresh one if needed 2 Veri...

Страница 41: ...Check the position of the stroke adjustment knob The GTO Inc Technical Service Department is open Monday Friday 8 00 A M 5 00 P M Eastern Time Telephone 800 543 1236 Telephone 850 575 4144 VOLTAGE RA...

Страница 42: ...ary the Service Department will assign a Return Goods Authorization RGA number to you 4 Securely pack the component s authorized for return to the factory Write the RGA number issued to you on the out...

Страница 43: ...is recommended that you place a steel plate between the operator mounting brackets and masonry surface for additional strength B If a push to open installation is impossible due to traf c hazards terr...

Страница 44: ...t battery included Digital Keypad F300 The specially designed digital keypad can be easily installed as a wireless or wired keypad It can be programmed to use up to fteen different personal identi cat...

Страница 45: ...battery included HEDDOLF UNIVERSAL RECEIVER MODEL 294 Accessories con t The contents of all material available on this installation manual are copyrighted by GTO Inc GTO unless otherwise indicated Al...

Отзывы: