GSWeb Playground Equipment GS-W803 Скачать руководство пользователя страница 12

GSWeb Playground Equipment 

E-mail) [email protected] 

Website) www.gsweb21.com 

Tel) +82 (0)55 326 9025 

Fax) +82 (0)55 326 9026 

65, Saengnim-daero 259beon-gil, Saengnim-Myeon 

Gimhae-si, Gyeongsangnam-do, Republic of Korea 

IGLOO NET 

MODEL NO. 

Rev_1 

2016.03. 

GS-W803 

12 

Maintenance 

A. General safety measures

 

On the playground there should be a sign(pictogram) giving the following information: 

 

a) general emergency telephone number; 

b) telephone number to contact maintenance personnel; 

c) name of the playground; 

d) address of playground; and 

e) other relevant local information, if applicable. 

 

The entry, exit and emergency paths to and from a playground, intended for use by the public and emergency services, should be accessible 

and free of obstacles at all times. 

 

NOTE  Attention is drawn to local regulations. 

 

B. Procedures

 

Defects that occur during operation and which put safety at risk should be corrected without delay. If this is not possible, the equipment 

should be secured against use e.g. by immobilization or removal. 

There should be written operational procedures covering the measures to be taken in the event of accidents, fire and the like. 

Until unsafe equipment is repaired and released for use, access by the public should be prevented. Information about accidents brought to 

the attention of the manager should be recorded on a form that includes the following details: 

 

a) date and tie of accident; 

b) age and sex of victim and clothing worn, Including footwear; 

c) equipment involved; 

d) number of children on site at the time of the accident; 

e) description of accident; 

f) injury sustained including part(s) of body affected; 

g) action taken; 

h) witness statements; 

i) any subsequent equipment modification; 

j) weather conditions; and 

k) any other relevant information. 

Содержание GS-W803

Страница 1: ...1 Removing the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this workstep turnbuckle assembly 2 Abrasion con...

Страница 2: ...EN W 24 1 7 34 m Use zone L 24 10 7 56 m ASTM W 24 10 7 56 m Completed Net Features The series is a steel framed climbing structure made of steel loaded Nylon cables and comes protected against UV Th...

Страница 3: ...one Fall Height and safety area Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment shall extend no...

Страница 4: ...nim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 1 825 1 825 3 650 1 825 1 825 3 650 700 500 4 x 4 3 4 x L200 Set Anchor B N Drill deep min150 300 FL 0 7...

Страница 5: ...m Tel 82 0 55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 5 Post Plate Assembly Att...

Страница 6: ...Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 6 Base Assembly It is strongly recommended that 3 4 workers lift the net into place Lower Pipe assembly No...

Страница 7: ...x 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 7 Pipe Assembly 2 Pipe Ball connector assembly 2 N...

Страница 8: ...c of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 No 63 Eyelet Shackle Set No 103 Eye Bolt Set No 61 Shackle connector 8 Attaching Net to Connector with Eyelet Shackle Middle Shackle Connector assem...

Страница 9: ...9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea IGLOO NET MODEL NO Rev_1 2016 03 GS W803 9 Attaching Cap to Ball Connector Attachin...

Страница 10: ...commended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to IPEMA...

Страница 11: ...t 1 Ball Connector 1 2 Ball Connector 2 3 Ball Connector 3 4 Pipe S 5 Pipe L 21 Post Plate 41 Set Anchor 61 Shackle Connector 62 Ball Connector Cap 63 Eyelet Shackle Set 101 M22 Bolt set 102 RH Bolt S...

Страница 12: ...ocal regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e g...

Страница 13: ...ures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify l...

Отзывы: