
7
QUAD MAST NET CLIMBER
MODEL NO.
GS-W4002
Concrete Footings
Figure-7:
Concrete Footing work
[concrete footing work]
Pour wet concrete in the wooden support frame
[Concrete]
Pour concrete* into wooden support frame until flush to top edge
Allow 3-5 days for concrete to cure before proceeding to next step.
*Contrete is to be wet concrete with minimum 25 MPa / 3500 PSI.