GSWeb Playground Equipment GS-W4002 Скачать руководство пользователя страница 1

1

QUAD MAST NET CLIMBER

MODEL NO.

GS-W4002

INSTALLATION MANUAL

Safety Checklist after first assembly

Test intervals of  Safety: 6 months

Test Component and contents:

1. Removing the reticulated system:
- Check of removing condition each rope
- Screwing the turn buckle and conversion the turnbuckle

in anchors plate(see for this workstep turnbuckle assembly)

2. Abrasion condition of rope:
- Checking of all rope surface
- Strengthned of rope: Coating on the surface
3. Attachment condition of the anchors plate and turnbuckle
4. Screwing condition of all bolt
5. Galvanizing condition of  the steel component:
- Protection of steel component from corrosion.

Measure

In case of the appearance the defect detail is 
repaired usually within 3 days after checking.

SHINHEUNG   ENG

1046-3, Najeon-ri, Saengnim-myeon, 
Gimhae-si Gyeongsangnam-do, 621-821, 
Republic Of Korea   
Tel) +82. 55. 326. 9096~7  
Fax) +82. 55. 326. 9022
E-mail) [email protected]
Web site) www.gsweb21.com

Содержание GS-W4002

Страница 1: ...dition of rope Checking of all rope surface Strengthned of rope Coating on the surface 3 Attachment condition of the anchors plate and turnbuckle 4 Screwing condition of all bolt 5 Galvanizing conditi...

Страница 2: ...ing surface is textile reinforced flexible rubber material The GS W4002 features GS Web Technology which includes the highest steel content and the strongest connection materials in the industry inclu...

Страница 3: ...no less than 72 in 1830mm from all sides of the play structure Fall Height a 6 3 1900mm Height from surface The Fall height on the extennal surface of a pyramid shaped space net is the hightest point...

Страница 4: ...ed Grade 12 300mm P2 Depth of concrete footing 31 800mm Center Figure 4 Foundation section view Foundation Please refer to GS W4002 drawing for installation dimension Figure 3 Excavate enough material...

Страница 5: ...tion anchor plate on concrete footing CF L anchor hole Front edge of anchor plate must be installed 4 100mm from the edge of concrete footing 100 200 100 Figure 5 Footing and anchor plate layout Ancho...

Страница 6: ...a wood jig for Anchor plate b wood support frame for concrete NOTE Use anchor plate as guide for exact measurements 5 7 7 7 7 Assemble wooden support frames 8 frames 3 11 1200mm L x 3 11 1200mm W x 3...

Страница 7: ...ooting work concrete footing work Pour wet concrete in the wooden support frame Concrete Pour concrete into wooden support frame until flush to top edge Allow 3 5 days for concrete to cure before proc...

Страница 8: ...EL NO GS W4002 Remove the wood support frame Remove wood support frame from dry concrete blocks After concrete has cured enough remove frames and replace soil around footing to subgrade level Figure 8...

Страница 9: ...EL NO GS W4002 Anchor Plate Assembly Figure 10 Attach Anchor plate to footing with flat washer locking washer and nut b Post plate Figure 9 Concreted blocks Clean threads of L Anchors a Anchor Plate b...

Страница 10: ...DEL NO GS W4002 STEP 1 Figure 11 Find Nylon String STEP 2 Figure 12 Insert Post following Nylon string Post Assembly Insert Post following nylon string Nylon string NOTE Remove string prior to placing...

Страница 11: ...olt assembly STEP 4 Figure 15 Post cap assembly Place Cap on Post Thread the mast through the net s center per diagrams below or following factory installed guide string Press the cap already attached...

Страница 12: ...C A B B Safety Cable Attaching Attach safety cable to anchor plates A B C as shown in Figure 16 This will be repeated for the other three posts as outlined Figure 17 Safety cable Assembly After succes...

Страница 13: ...S W4002 Safety Cable Attachment Figure 18 Repeat Step 1 on the second post Step 2 Figure 19 Safety cable attachment A B B STEP 1 A STEP 2 A B Working Process It is strongly recommended that a machine...

Страница 14: ...tand remaining posts up Step 3 Step 4 Step 1 STEP 5 STEP 1 Step 2 Step 3 Step 4 STEP 2 STEP 3 STEP 4 Step 5 After standing up the Net Attach remaining safety rope and Turnbuckles Figure 21 Loosen Turn...

Страница 15: ...ighten Turnbuckles Figure 23 Turnbuckle Assembly M22 X L110 H T BOLT Anchor plate Turnbuckle a a b b b b a a a a b b Tighten Cable with Turnbuckle at the Same time Tighten Cable with Turnbuckle at the...

Страница 16: ...also recommended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to...

Страница 17: ...17 QUAD MAST NET CLIMBER MODEL NO GS W4002 Tensioning Maintenance information...

Страница 18: ...02 PARTS LIST 1 2 8 3 5 4 11 7 10 9 6 10 1 main post 2 multi compound rope 3 post cap 4 turn buckle 5 anchor shackle 6 shock proof ring 7 H T bolt nut washer 8 U bolt nut washer 9 main post plate 10 L...

Страница 19: ...CLIMBER MODEL NO GS W4002 Maintenance A weekly check of the activity net is recommended to ensure that no acts of vandalism have damaged the rope Periodic checks on tension will assist in the durabili...

Страница 20: ...e corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the measures to b...

Страница 21: ...of any impact attenuating surfaces d lubrication of bearings e markig of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or contaminants h...

Отзывы: