GSWeb Playground Equipment GS-SC2300F Скачать руководство пользователя страница 11

GSWeb Playground Equipment 

E-mail) [email protected] 

Website) www.gsweb21.com 

Tel) +82 (0)55 326 9025 

Fax) +82 (0)55 326 9026 

65, Saengnim-daero 259beon-gil, Saengnim-Myeon 

Gimhae-si, Gyeongsangnam-do, Republic of Korea 

SPACE CRAFT 

MODEL NO. 

Rev_0 

2015.05 

GS-SC2300F 

11 

Deck Assembly 

No. 41 

Deck 

No. 104: 

M10 X L100 Bolt Set 

No. 106: 

M12 x L35 Bolt Set 

No. 42: 

Deck Holder  

No. 105 

M12 x L45 Bolt Set with L-Angle 

No. 109 

M10 X 80 Bolt Set 

No. 105 

M12 x L45 Bolt Set 

With L-angle 

No. 106: 

M12 x L35 Bolt Set 

Содержание GS-SC2300F

Страница 1: ...ts 1 Removing the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this workstep turnbuckle assembly 2 Abrasion condition of rope Checking of all rope surface Strengthened of rope Coating on the surface 3 Attachment condition of the anchors plate and turnbuckle 4 Screwing condition of all bolt 5 Galvanizing con...

Страница 2: ...d into the future with a space age look Children love the flying saucer design that helps their imaginations fly into orbit Our special bearing system controls the rotation speed so that the children can safely enjoy the same exhilarating experience as a merry go round The GS SC2300F features GS Web Technology which includes the highest steel content and the strongest connection materials in the i...

Страница 3: ...ODEL NO Rev_0 2015 05 GS SC2300F 1 525 1 370 1 220 100 2 000 EN 1 830 ASTM 7 300 6 960 F L 2200 3 205 3 Safety area and Fall Height zone Fall Height and safety area Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment shall extend no less than 72 in 1830mm from all sides of the play structure Fall He...

Страница 4: ...ngsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2300F 1 525 1 370 1 220 100 F L 2200 3 205 4 Foundation Information Foundation Measure location and dig a hole 1525mm x 1525mm x 1370mm deep centered on the center of the spacecraft Attention It is very important to keep a bottom of the lower ring 100 mm apart from Finished level according to safety standard ...

Страница 5: ...r Post No 21 Galvanized Base No 6 Lower Ring No A Upper Net No B Spider Net Overall Assembly Assemble the parts in the following order 1 Attach the upper net to the post head 2 Attach the ring to the net 3 Attach the spider net to the ring and the collar 4 Attach the lower net to the ring 5 Temporarily support the lower net by tying it to the middle ring before lifting the assembly 6 Assemble base...

Страница 6: ...5 GS SC2300F 6 Post installation 60 54 12 NYLON STRING EYE BOLT 7 Screw the eye bolt to the top of the galvanized post 8 Lift the assembly and place in the hole inserting the post into the pre assembled base 9 Level the post and fill hole with excavated ground 10 Install the protective surface 11 Assemble the lower ring and deck attach to lower net 12 Attach deck to collar on the post 13 Remove ey...

Страница 7: ... daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2300F 7 Wooden support frame Base Assembly No 22 Angle Brace No 101 M12 x 35 Bolt set NO 21 Galvanized Base No 23 Base Half Collar Base Assembly No 101 M12 x L35 Bolt set Assemble all parts of base as shown below ...

Страница 8: ...on gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2300F No 112 Fix bolt and Nut 8 Upper ring Assembly Assemble the ring at the net with the nylon joint 1 1 2 2 3 3 4 4 Align the opening in the net with the ring fasteners 4 4 1 1 3 3 2 2 No 63 Nylon Joint No 5 Upper Ring No B Spider Net ...

Страница 9: ...im daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2300F 9 Spider Net Upper net Assembly Fix bolt and nut No B Spider Net No B Spider Net No A Upper Net No 5 Upper Ring Attach the upper ring to the upper net Attach the spider net to the upper ring and the post ...

Страница 10: ...Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2300F 10 Lower ring Assembly No 6 Lower half Ring Attach the two lower half rings with the nylon joints Align the opening in the net with the opening in the ring fasteners before attaching the net to the ring No 64 Nylon Joint No 113 Fix Bolt and Nut ...

Страница 11: ...beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2300F 11 Deck Assembly No 41 Deck No 104 M10 X L100 Bolt Set No 106 M12 x L35 Bolt Set No 42 Deck Holder No 105 M12 x L45 Bolt Set with L Angle No 109 M10 X 80 Bolt Set No 105 M12 x L45 Bolt Set With L angle No 106 M12 x L35 Bolt Set ...

Страница 12: ...82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2300F 12 No 41 1 Deck Cover No 108 M8 x L20 Bolt Set No 61 L Angle No 107 M8 x L35 Bolt Set Deck Cover assembly Bottom View of Deck Completed bottom of Deck ...

Страница 13: ... 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2300F 13 Lower net assembly No 5 UPPER RING No C Lower Net No 6 LOWER Half RING Assemble net in the attach with fix bolt and nut ...

Страница 14: ...326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea SPACE CRAFT MODEL NO Rev_0 2015 05 GS SC2300F 14 Cap assembly Remove the eye bolt Install the cap on the top of post No 111 RH Bolt Set No 62 Post cap Remove the eye bolt ...

Страница 15: ... Brace 23 Base Half Collar 41 Deck 41 1 Deck Cover 42 Deck Holder 61 L Angle 62 Post Cap 63 Nylon Joint 64 Nylon Joint 101 M12 x L35 Bolt Set 104 M10 x L100 RH Bolt Set 105 M12 x L45 Bolt Set 106 M12 x L35 Bolt Set 107 M8 x L35 Bolt Set 108 M8 x L20 RH Bolt Set 109 M10 x L80 RH Bolt Set 110 Eye Bolt 111 M10 x L25 RH Bolt Set 112 Fix Bolt and Nut 113 Fix Bolt and Nut No 22 Angle Brace No 2 Inner Po...

Страница 16: ...nner post 5 Upper Ring 6 Lower Half Ring 21 Galvanized Base 22 Angle Brace 23 Base Half Collar 41 Deck 41 1 Deck Cover 42 Deck Holder 61 L Angle 62 Post Cap 63 Nylon Joint 64 Nylon Joint 101 M12 x L35 Bolt Set 104 M10 x L100 RH Bolt Set 105 M12 x L45 Bolt Set 106 M12 x L35 Bolt Set 107 M8 x L35 Bolt Set 108 M8 x L20 RH Bolt Set 109 M10 x L80 RH Bolt Set 110 Eye Bolt 111 M10 x L25 RH Bolt Set 112 F...

Страница 17: ...o 6 Lower half Ring No 41 Deck No 105 M12 x L45 Bolt Set With L angle No 113 Fix Bolt and Nut No 64 Nylon Joint Parts check list A Upper Net B Spider Net C Lower Net 1 Outer Post 2 Inner post 5 Upper Ring 6 Lower Half Ring 21 Galvanized Base 22 Angle Brace 23 Base Half Collar 41 Deck 41 1 Deck Cover 42 Deck Holder 61 L Angle 62 Post Cap 63 Nylon Joint 64 Nylon Joint 101 M12 x L35 Bolt Set 104 M10 ...

Страница 18: ...o 107 M8 x L35 Bolt Set Parts check list A Upper Net B Spider Net C Lower Net 1 Outer Post 2 Inner post 5 Upper Ring 6 Lower Half Ring 21 Galvanized Base 22 Angle Brace 23 Base Half Collar 41 Deck 41 1 Deck Cover 42 Deck Holder 61 L Angle 62 Post Cap 63 Nylon Joint 64 Nylon Joint 101 M12 x L35 Bolt Set 104 M10 x L100 RH Bolt Set 105 M12 x L45 Bolt Set 106 M12 x L35 Bolt Set 107 M8 x L35 Bolt Set 1...

Страница 19: ...to local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the measures to be taken in the event of accidents fire and the like Until unsafe equipment is repaired and re...

Страница 20: ...easures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or contaminants h restoring loose fills to the correct level and i maintenance of free space areas D Correctiv...

Отзывы: