GSWeb Playground Equipment GS-SC2300 Скачать руководство пользователя страница 4

4

SPACECRAFT

MODEL NO.

GS-SC2300

Foundation Layout

10620

6960

4

6

2

0

 (

G

A

L

V

A

N

IZ

E

D

 P

O

S

T

 L

E

N

G

T

H

)

1

3

7

0

1220
1525

3300

3

4

0

0

1

0

0

1830

3300

1525

1

5

2

5

1830

3

1

7

0

 (

IN

O

X

 P

O

S

T

 L

E

N

G

T

H

)

1

3

2

0

1

9

5

0

Finished Grade

Figure-4:

Foundation layout

Imperial/Metric conversion:

48" = 1220mm
54" = 1370mm
60" = 1525mm
72" = 1830mm
130" = 3300mm
134" = 3400mm
274" = 6960mm
418" = 10620mm

Foundation

Measure location of game and dig a hole 
5' x 5' x 4' 6" deep centered on the center 
of the game. 

Содержание GS-SC2300

Страница 1: ...GS SC2300 INSTALLATION MANUAL SHINHEUNG ENG 1046 3 Najeon ri Saengnim myeon Gimhae si Gyeongsangnam do 621 821 Republic Of Korea Tel 82 55 326 9096 7 Fax 82 55 326 9022 E mail gswebinfo chol com Web...

Страница 2: ...it Our special bearing system controls the rotation speed so that the children can safely enjoy the same exhilarating experience as a merry go round The GS SC2300 features GS Web Technology which incl...

Страница 3: ...for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment shall extend no less than 72 in 1830mm from all sides of the play structure...

Страница 4: ...0 1830 3300 1525 1525 1830 3170 INOX POST LENGTH 1320 1950 Finished Grade Figure 4 Foundation layout Imperial Metric conversion 48 1220mm 54 1370mm 60 1525mm 72 1830mm 130 3300mm 134 3400mm 274 6960mm...

Страница 5: ...POST Overall Assembly Assemble the parts in the following order 1 Attach the upper net to the post head 2 Attach the ring to the net 3 Attach the spider net to the ring and the collar 4 Attach the lo...

Страница 6: ...post 8 Lift the assembly and place in the hole inserting the post into the pre assembled base 9 Level the post and fill with excavated ground 10 Install the protective surface 11 Assemble the lower r...

Страница 7: ...sembly M8 X L33 RING FIX NUT WASHER M8 X L55 RING FIX BOLT 12 fasteners on the top UPPER RING Figure 8 NYLON JOINT Assemble the ring at the net with the nylon joint 1 1 2 2 3 3 4 4 Align the opening i...

Страница 8: ...Net Upper net Assembly HALF ALUMINIUM RING BALL JOINT COLLAR M10 NUT WASHER M10 X L35 HSCS BOLT SPIDER NET UPPER NET BALL JOINT Figure 9 Figure 10 Figure 11 Attach the ring to the upper net Attach the...

Страница 9: ...9 SPACECRAFT MODEL NO GS SC2300 ALUMINIUM RING LOWER NET M10 X L35 HSCS BOLT NUT WASHER Figure 12 Lower net assembly...

Страница 10: ...10 SPACECRAFT MODEL NO GS SC2300 ANGLE BRACE M12 X L35 BOLT M12 NUT WASHER M12 X L35 BOLT BASE PLATE M12 NUT WASHER BASE HALF COLLAR Figure 13 Base assembly...

Страница 11: ...11 SPACECRAFT MODEL NO GS SC2300 BALL JOINT M10 X L25 HSCS BOLT POST CAP Remove the eye bolt Install the cap with HSCS bolt Cap assembly...

Страница 12: ...galvanised post 2 inox post 3 post cap 4 upper net 5 spider net 6 lower net 7 aluminium ring 3300 8 nylon joint 50 9 half collar 10 eye bolt 11 M10 X L25 HSCS bolt 12 M10 X L35 HSCS bolt 13 nylon lock...

Страница 13: ...13 SPACECRAFT MODEL NO GS SC2300 Parts list 4 14 M8 X L25 fix bolt 15 M8 X L33 fix nut washer 16 base 17 angle brace 18 base half collar 19 M12 X L35 bolt 20 M12 nut washer 16 17 18 19 20 1 6 2 9...

Страница 14: ...rected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the measures to be tak...

Страница 15: ...ny impact attenuating surfaces d lubrication of bearings e markig of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or contaminants h rest...

Отзывы: