
www.gsl-energy.com
- 10 -
Key description
1) SW1----NEMU
,
SW2----ENTER
,
SW3----UP
,
SW4----DOWN
,
SW5----ESC.
2) Each item is “
》
”or“--”as a beginning
,
among them“
》
”shows the current cursor position
,
press UP or DOWN key can move the cursor position
;
with“
》
”end of the project
,
the
content of the said project has not shown, press ENTER key can enter the corresponding
page.
3) Press ESC key can be returned at the next higher level directory
;
In any position
,
press
NEMU key can return to the main menu page.
4) In a dormant state, press any key, can activate the screen.
Dormancy/shutdown
Under normal operation condition, with no keystrokes 1 minutes later, system will enter a
state of dormancy/shutdown.
Shutdown/dormancy state
,
press any key
,
screen can be activated.
4.Safe handli
ng
guide
4.1.
System Diagram
4.2.
Tools
The following tools are required to install the battery pack:
Wire cutter
Crimping Modular Plier
Screw Driver
NOTE
Use properly insulated tools to prevent accidental electric shock or short circuits.
If insulated tools are not available, cover the entire exposed metal surfaces of the available
tools, except their tips, with electrical tape.
Содержание GSL10000U
Страница 16: ...www gsl energy com 15 Three pcs connect diagram Four pcs connect diagram ...
Страница 19: ...www gsl energy com 18 Canbus Version Max 15 PCS RS485 Version Max 14 pcs ...
Страница 20: ...www gsl energy com 19 One pcs connect diagram ...
Страница 21: ...www gsl energy com 20 Two pcs connect diagram ...
Страница 22: ...www gsl energy com 21 Three pcs connect diagram ...
Страница 23: ...www gsl energy com 22 Four pcs connect diagram ...
Страница 24: ...www gsl energy com 23 15 14 pcs connect diagram ...